Reliability assessment of a standalone wind-conventional/energy storage system using probabilistic production simulation method

被引:2
作者
Delavaripour, Hossein [1 ]
Dehkordi, Behzad Mirzaeian [1 ]
机构
[1] Univ Isfahan, Dept Elect Engn, Fac Engn, Esfahan, Iran
关键词
Battery modeling; time series simulation; probabilistic production simulation; reliability; wind; conventional generating source; GENERATING SYSTEMS; ADEQUACY ASSESSMENT; POWER-SYSTEMS; MODELS;
D O I
10.3906/elk-1404-241
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This paper presents a reliability evaluation technique for a small standalone system including wind and conventional resources integrated with an energy storage system. A battery bank is considered as the energy storage system. The focus in this analysis is on the effect of battery modeling and its performance on system reliability. In this way, this paper presents an accurate model for the electrochemical batteries, which takes into account all the influential characteristics of the battery related to reliability studies, such as depth of charge, efficiency of charge, and rate of discharge. The proposed reliability evaluation method is based on the combination of a probabilistic production simulation technique as an analytical method and time series technique, in the domain of adequacy studies. By using the probabilistic production simulation technique, not only can the reliability of wind-conventional resources be assessed, but the fuel consumption can also be analyzed. On the other hand, by using the time series approach, the time variation of wind speed and operating constraints of the battery bank can be considered in evaluating the reliability indices. In this paper, a typical lead acid battery bank is used. It is shown how the accurate modeling of the battery bank can affect the reliability indices. Beneficial results are obtained for different operating strategies and wind penetrations and are then compared.
引用
收藏
页码:1996 / 2016
页数:21
相关论文
共 34 条
[1]   Reliability/cost evaluation of a wind power delivery system [J].
Abul'Wafa, Ahmed R. .
ELECTRIC POWER SYSTEMS RESEARCH, 2011, 81 (04) :873-879
[2]  
[Anonymous], 1979, IEEE T POWER AP SYST, V98, P2047, DOI 10.1109/TPAS.1979.319398
[3]   Incorporating well-being considerations in generating systems using energy storage [J].
Bagen ;
Billinton, R .
IEEE TRANSACTIONS ON ENERGY CONVERSION, 2005, 20 (01) :225-230
[4]   Comparison of alternative probabilistic techniques for adequacy assessment of small isolated wind/diesel systems [J].
Bagen B. ;
Gao Y. ;
Li W.Y. .
International Journal of System Assurance Engineering and Management, 2010, 1 (02) :129-134
[5]  
Baring-Gould I, 2007, ARCT EN SUMM TECHN C
[6]   Reliability assessment of a wind-power system with integrated energy storage [J].
Bhuiyan, F. A. ;
Yazdani, A. .
IET RENEWABLE POWER GENERATION, 2010, 4 (03) :211-220
[7]   Time-series models for reliability evaluation of power systems including wind energy [J].
Billinton, R ;
Chen, H ;
Ghajar, R .
MICROELECTRONICS AND RELIABILITY, 1996, 36 (09) :1253-1261
[8]   Reliability evaluation of small stand-alone wind energy conversion systems using a time series simulation model [J].
Billinton, R ;
Bagen ;
Cui, Y .
IEE PROCEEDINGS-GENERATION TRANSMISSION AND DISTRIBUTION, 2003, 150 (01) :96-100
[9]   Wind power modelling and the determination of capacity credit in an electric power system [J].
Billinton, R. ;
Huang, D. .
PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART O-JOURNAL OF RISK AND RELIABILITY, 2010, 224 (O1) :1-9
[10]   Multistate wind energy conversion system models for adequacy assessment of generating systems incorporating wind energy [J].
Billinton, Roy ;
Gao, Yi .
IEEE TRANSACTIONS ON ENERGY CONVERSION, 2008, 23 (01) :163-170