Simultaneous planning and scheduling of single-stage multi-product continuous plants with parallel lines

被引:76
作者
Erdirik-Dogan, Muge [1 ]
Grossmann, Ignacio E. [1 ]
机构
[1] Carnegie Mellon Univ, Dept Chem Engn, Pittsburgh, PA 15213 USA
基金
美国国家科学基金会;
关键词
planning scheduling; multi-product continuous plants; MILP; slot based formulation;
D O I
10.1016/j.compchemeng.2007.07.010
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In this paper we present a multi-period mixed integer linear programming model for the simultaneous planning and scheduling of single-stage multi-product continuous plants with parallel units. While effective for short time horizons, the proposed scheduling model becomes computationally expensive to solve for long time horizons. In order to address this problem, we propose a bi-level decomposition algorithm in which the original problem is decomposed into an upper level planning and a lower level scheduling problem. For the representation of the upper level, we propose an MILP model which is based on a relaxation of the original model, but accounts for the effects of scheduling by incorporating sequencing constraints, which results in very tight upper bounds. In the lower level the simultaneous planning and scheduling model is solved for a subset of products predicted by the upper level. These sub-problems are solved iteratively until the upper and lower bounds convage. A number of examples are presented that show that the planning model can often obtain the optimal schedule in one single iteration. (c) 2007 Elsevier Ltd. All rights reserved.
引用
收藏
页码:2664 / 2683
页数:20
相关论文
共 21 条
[1]   A mathematical programming approach for cyclic production and cleaning scheduling of multistage continuous plants [J].
Alle, A ;
Papageorgiou, LG ;
Pinto, JM .
COMPUTERS & CHEMICAL ENGINEERING, 2004, 28 (1-2) :3-15
[2]  
[Anonymous], 1998, INTEGER COMBINATORIA
[3]   CANONICAL CUTS ON UNIT HYPERCUBE [J].
BALAS, E ;
JEROSLOW, R .
SIAM JOURNAL ON APPLIED MATHEMATICS, 1972, 23 (01) :61-&
[4]   Decomposition techniques for the solution of large-scale scheduling problems [J].
Bassett, MH ;
Pekny, JF ;
Reklaitis, GV .
AICHE JOURNAL, 1996, 42 (12) :3373-3387
[5]   SIMULTANEOUS PRODUCTION PLANNING AND SCHEDULING IN MULTIPRODUCT BATCH PLANTS [J].
BIREWAR, DB ;
GROSSMANN, IE .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1990, 29 (04) :570-580
[6]  
Dimitriadis AD, 1997, COMPUT CHEM ENG, V21, pS1061
[7]   A decomposition method for the simultaneous planning and scheduling of single-stage continuous multiproduct plants [J].
Erdirik-Dogan, M ;
Grossmann, IE .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2006, 45 (01) :299-315
[8]   Planning models for parallel batch reactors with sequence-dependent changeovers [J].
Erdirik-Dogan, Muge ;
Grossmann, Ignacio E. .
AICHE JOURNAL, 2007, 53 (09) :2284-2300
[9]  
Jain V, 1998, AICHE J, V44, P1623
[10]   Efficient short-term scheduling of refinery operations based on a continuous time formulation [J].
Jia, ZY ;
Ierapetritou, M .
COMPUTERS & CHEMICAL ENGINEERING, 2004, 28 (6-7) :1001-1019