Determining factor for the development of CDM biomass power projects

被引:13
作者
Amatayakul, Wathanyu [1 ]
Berndes, Goran [1 ]
机构
[1] Chalmers Univ Technol, Environm & Energy Dept, S-41296 Gothenburg, Sweden
关键词
Biomass power; Power purchase; Carbon credits; CDM; Developing countries; BAGASSE COGENERATION;
D O I
10.1016/j.esd.2012.01.004
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
In this paper, a hypothesis that government's guarantee of power purchase rather than guarantee of carbon credit purchase determines the development of CDM biomass power projects in developing countries is tested by an empirical analysis using objective indicators and by an econometric analysis. The empirical analysis shows that there are indications that guarantee of power purchase rather than guarantee of access to sell carbon credits or guarantee of carbon credit purchase determines the development of a large percentage of registered CDM bagasse power projects in Brazil, India and Thailand. The result from the econometric analysis supports the hypothesis. The result also suggests that power purchase guarantee significantly determines whether or not there is development of a CDM biomass power project based on agricultural residues in a country. This suggests that implementing policies and regulations that guarantee an access for biomass power developers to sell electricity to the grid at an attractive price could lead to the development of biomass power projects in a larger number of developing countries. (C) 2012 Elsevier Inc. All rights reserved.
引用
收藏
页码:197 / 203
页数:7
相关论文
共 40 条
  • [1] [Anonymous], 2007, PDD1026 CDM
  • [2] [Anonymous], 2005, PDD249 CDM
  • [3] [Anonymous], 77 EUR BANK REC DEV
  • [4] [Anonymous], 2006, PDD288 CDM
  • [5] Arquit NiederbergerA., 2005, TRANSNATIONAL CORPOR, V14, P1
  • [6] Balce RG, 2003, OVERVIEW BIOMASS POW
  • [7] Bell J, 2005, INT SUGAR J, V107, P380
  • [8] Cames M., 2007, Long-term prospects of CDM and JI
  • [9] CDM, 2015, CLEAN DEV MECH SEO B
  • [10] CIA, 2007, CIA WORLD FACTB GDP