Success Factors Among Industrialised Building System (IBS) Contractors in Malaysia

被引:4
作者
Adnan, Hamimah [1 ]
Baharuddin, Har Einur Azrin [1 ]
Hassan, Ahmad Arzlee [1 ]
Mahat, Noor Aisyah Asyikin [1 ]
Kaharuddin, Sakinah Khalidah [1 ]
机构
[1] Univ Teknol MARA, Fac Architecture Planning & Surveying, Shah Alam, Selangor, Malaysia
来源
2018 INTERNATIONAL CONFERENCE ON CONSTRUCTION, AVIATION AND ENVIRONMENTAL ENGINEERING | 2019年 / 233卷
关键词
UK HOUSEBUILDERS;
D O I
10.1088/1755-1315/233/2/022033
中图分类号
V [航空、航天];
学科分类号
08 ; 0825 ;
摘要
Construction joint ventures in Malaysia are become increasingly popular both with local and foreign companies in order to achieve their individual objectives. The contractors need to know the success factors, which were consider critical for their JVs to be successful. This paper aims to identify the success factors of joint venture projects among IBS contractors in Malaysia. Questionnaires were distributed to 200 IBS contractors registered under the Construction Industry Development Board (CIDB) in Malaysia with fifteen percent (15%) replied. Questionnaire consists of information regarding the level of joint venture acceptance and the success factors of joint ventures among IBS contractors. It was found that there were nine (9) factors of success which were experienced workforce and technical capability, skilled labour for site installation, good working collaboration, coordination of design, manufacture and construction, effective communication channel and close relationship with suppliers or contractor. It is recommended that these nine factors are considered as the key success factors of joint venture among IBS contractors. It is hope that those factors will provide useful guidelines for all contractors whom intend to pursue the joint venture on IBS projects.
引用
收藏
页数:6
相关论文
共 16 条
[1]  
[Anonymous], 2009, IND BUILD SYST IBS I
[2]  
[Anonymous], 2008, MALAYSIA CONSTR RES
[3]  
[Anonymous], 2003, IBS SURV 2003 SURV U
[4]  
[Anonymous], 2015, 2 INT C SCI SOC RES
[5]  
Bernama, 2006, MOR 5 MILL FOR WORK
[6]  
Idrus A., 2008, INT C CONSTR BUILD T, P75
[7]  
Kamar K.A.M., 2012, IEEE BUS ENG IND APP
[8]  
Maidin A. J., 2009, USING ALTERNATIVE DI, P113
[9]  
Malik N.A.F., 2006, MALAYSIAN INT IBS EX
[10]  
Murray M, 2007, CORPORATE SOCIAL RES