Supporting conflict management in collaborative design: An approach to assess engineering change impacts

被引:44
作者
Ouertani, M. Z. [1 ]
机构
[1] Univ Cambridge, Dept Engn, Cambridge CB2 1RX, England
关键词
Collaborative process; Design process traceability; Engineering data dependencies; Conflicr management; Engineering change; Process coordination strategies;
D O I
10.1016/j.compind.2008.07.010
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
It is characteristic of collaborative engineering design that precedence relationships among design activities contain information flow conflicts. Due to multi-actors interaction, conflicts can emerge from disagreements between designers about proposed designs. Hence, a critical element of collaborative design is to manage the detected conflicts and particularly the impacts once they are resolved. Indeed, the conflict resolution comes up with a solution which often implies modifications on the product and the process organisation. This paper deals with the problem of conflict management process and particularly the impacts of changes once a conflict is resolved. First, a solution is proposed to assess the impact oil the product data based on the concept of data dependencies network. Second, this paper quantifies key issues with regards to Concurrent Engineering that enables us to better manage the design process. Strategies to overlap Coupled activities are proposed based on the dependencies between the handled data during the design process. Furthermore, prospects to effectively re-organise the execution of design activities are proposed. Key features for a better process re-organization are Studied: overlapping rate and multifunctional interaction rate. The author examines, under varying uncertainty conditions, how these key parameters affect the process performance of product development time and effort. Findings and recommendations to optimise the process re-organisation are summarized. (C) 2008 Elsevier B.V. All rights reserved.
引用
收藏
页码:882 / 893
页数:12
相关论文
共 44 条
[11]   A MODEL-BASED METHOD FOR ORGANIZING TASKS IN PRODUCT DEVELOPMENT [J].
EPPINGER, SD ;
WHITNEY, DE ;
SMITH, RP ;
GEBALA, DA .
RESEARCH IN ENGINEERING DESIGN-THEORY APPLICATIONS AND CONCURRENT ENGINEERING, 1994, 6 (01) :1-13
[12]  
FINGER S, 1988, P 2 IFIP WG 5 2 WORK
[13]   An evaluation of research on Integrated Product Development [J].
Gerwin, D ;
Barrowman, NJ .
MANAGEMENT SCIENCE, 2002, 48 (07) :938-953
[14]   A modelling tool for the management of product data in a co-design environment [J].
Giannini, F ;
Monti, M ;
Biondi, D ;
Bonfatti, F ;
Monari, PD .
COMPUTER-AIDED DESIGN, 2002, 34 (14) :1063-1073
[15]   OPTIMAL TIMING OF REVIEWS IN CONCURRENT DESIGN FOR MANUFACTURABILITY [J].
HA, AY ;
PORTEUS, EL .
MANAGEMENT SCIENCE, 1995, 41 (09) :1431-1447
[16]   Progressive engineering changes in multi-level product structures [J].
Ho, CJ ;
Li, J .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1997, 25 (05) :585-594
[17]  
JARRATT T, 2002, ENG DES C EDC 02 KIN, V1, P487
[18]   Performance of coupled product development activities with a deadline [J].
Joglekar, NR ;
Yassine, AA ;
Eppinger, SD ;
Whitney, DE .
MANAGEMENT SCIENCE, 2001, 47 (12) :1605-1620
[19]  
Keller R., 2006, Information Visualization, V5, P62, DOI 10.1057/palgrave.ivs.9500116
[20]   IDCSS: Integrating workflow, conflict and rationale-based concurrent engineering coordination technologies [J].
Klein, M .
CONCURRENT ENGINEERING-RESEARCH AND APPLICATIONS, 1995, 3 (01) :21-27