Optimal sizing of battery energy storage systems in off-grid micro grids using convex optimization

被引:55
作者
Zolfaghari, Morteza [1 ]
Ghaffarzadeh, Navid [1 ]
Ardakani, Ali Jahanbani [2 ]
机构
[1] Imam Khomeini Int Univ, Dept Elect Engn, Qazvin, Iran
[2] Iowa State Univ, Dept Elect & Comp Engn, Ames, IA USA
关键词
Operational cost; Energy storage system; Optimal size; Convex optimization; Convex relaxation; OPERATION; EMISSION; COST;
D O I
10.1016/j.est.2019.02.027
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Battery as an energy storage system is a key element in Microgrids (MGs). Therefore, determining the optimal size of battery energy storage systems (BESS) can reduce the operational costs of MGs. The goal of this paper is to calculate the optimal size of a BESS in an off-grid MG while minimizing the total cost using convex optimization methods. This paper proposes a new two-step cost-based method to determine the optimal size of a BESS in an MG. In the first step, in order to optimize the operation of the MG, a unit commitment (UC) problem is solved. In the next step, the optimal size of the BESS is determined using convex optimization considering several physical and operational constraints. The resulting problem is a non-convex non-linear problem. However, the problem can be transformed into a convex problem using convex relaxation methods. In the next step, the convexity and feasibility of the optimization problem is proved. The CVX toolbox package integrated with MATLAB is used to solve the problem. To assess the effects of BESS on operational and total costs of the MG, four scenarios are studied. Additionally, the results have been compared with PSO and GA algorithms and effectiveness of the proposed method has been shown.
引用
收藏
页码:44 / 56
页数:13
相关论文
共 41 条
[1]   A new approach for optimal sizing of battery energy storage system for primary frequency control of islanded Microgrid [J].
Aghamohammadi, Mohammad Reza ;
Abdolahinia, Hajar .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2014, 54 :325-333
[2]   Techno-economic optimization of hybrid photovoltaic/wind generation together with energy storage system in a stand-alone micro-grid subjected to demand response [J].
Amrollahi, Mohammad Hossein ;
Bathaee, Seyyed Mohammad Taghi .
APPLIED ENERGY, 2017, 202 :66-77
[3]   Modeling of start-up and shut-down power trajectories of thermal units [J].
Arroyo, JM ;
Conejo, AJ .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2004, 19 (03) :1562-1568
[4]   Optimal sizing of battery energy storage for micro-grid operation management using a new improved bat algorithm [J].
Bahmani-Firouzi, Bahman ;
Azizipanah-Abarghooee, Rasoul .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2014, 56 :42-54
[5]   Reliability-Constrained Optimal Sizing of Energy Storage System in a Microgrid [J].
Bahramirad, Shaghayegh ;
Reder, Wanda ;
Khodaei, Amin .
IEEE TRANSACTIONS ON SMART GRID, 2012, 3 (04) :2056-2062
[6]   THE GENERALIZED UNIT COMMITMENT PROBLEM [J].
BALDICK, R .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1995, 10 (01) :465-475
[7]  
Boyd Stephen P., 2014, Convex Optimization
[8]   Determination methodology for optimising the energy storage size for power system [J].
Chakraborty, S. ;
Senjyu, T. ;
Toyama, H. ;
Saber, A. Y. ;
Funabashi, T. .
IET GENERATION TRANSMISSION & DISTRIBUTION, 2009, 3 (11) :987-999
[9]   Progress in electrical energy storage system: A critical review [J].
Chen, Haisheng ;
Cong, Thang Ngoc ;
Yang, Wei ;
Tan, Chunqing ;
Li, Yongliang ;
Ding, Yulong .
PROGRESS IN NATURAL SCIENCE-MATERIALS INTERNATIONAL, 2009, 19 (03) :291-312
[10]   Sizing of Energy Storage for Microgrids [J].
Chen, S. X. ;
Gooi, H. B. ;
Wang, M. Q. .
IEEE TRANSACTIONS ON SMART GRID, 2012, 3 (01) :142-151