A proactive approach to solve integrated production scheduling and maintenance planning problem in flow shops

被引:71
作者
Cui, Weiwei [1 ]
Lu, Zhiqiang [2 ]
Li, Chen [3 ]
Han, Xiaole [2 ]
机构
[1] Shanghai Univ, Sch Management, Shanghai 200444, Peoples R China
[2] Tongji Univ, Sch Mech Engn, Shanghai 201804, Peoples R China
[3] Shanghai Jiao Tong Univ, Sch Mech Engn, Shanghai 200240, Peoples R China
基金
中国国家自然科学基金;
关键词
Flow-shop; Scheduling; Maintenance; Proactive; MACHINE AVAILABILITY CONSTRAINTS; PREVENTIVE MAINTENANCE; SINGLE-MACHINE; SEQUENCING PROBLEM; GENETIC ALGORITHM; N JOBS; ROBUST; MAKESPAN; UNCERTAINTY; DISRUPTIONS;
D O I
10.1016/j.cie.2017.11.020
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper deals with the integration of production scheduling and maintenance planning in order to optimize the bi-objective of quality robustness and solution robustness for flow shops with failure uncertainty. First, a proactive model is proposed to formulate the problem mathematically. Then, Monte Carlo sampling method is adopted to obtain the objective value for feasible solutions and a surrogate measure is proposed to approximate the objective function efficiently. Based on the sampling method and surrogate measure, a two-loop algorithm is devised to optimize the sequence of jobs, positions of preventive maintenances and idle times simultaneously. Computational results indicate that solution robustness and stability of quality robustness can be significantly improved using our algorithm compared with the solutions obtained by the traditional way.
引用
收藏
页码:342 / 353
页数:12
相关论文
共 44 条
[1]   Flow shop scheduling problem with limited machine availability: A heuristic approach [J].
Aggoune, R ;
Portmann, MC .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2006, 99 (1-2) :4-15
[2]   Minimizing the makespan for the flow shop scheduling problem with availability constraints [J].
Aggoune, R .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 153 (03) :534-543
[3]   Robust and stable flexible job shop scheduling with random machine breakdowns using a hybrid genetic algorithm [J].
Al-Hinai, Nasr ;
ElMekkawy, T. Y. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2011, 132 (02) :279-291
[4]   Simultaneously scheduling n jobs and the preventive maintenance on the two-machine flow shop to minimize the makespan [J].
Allaoui, H. ;
Lamouri, S. ;
Artiba, A. ;
Aghezzaf, E. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 112 (01) :161-167
[5]   Proactive approach to address the uncertainty in short-term scheduling [J].
Bonfill, A. ;
Espuna, A. ;
Puigjaner, L. .
COMPUTERS & CHEMICAL ENGINEERING, 2008, 32 (08) :1689-1706
[6]   A polynomial-time approximation scheme for the two-machine flow shop scheduling problem with an availability constraint [J].
Breit, J .
COMPUTERS & OPERATIONS RESEARCH, 2006, 33 (08) :2143-2153
[7]   An improved approximation algorithm for two-machine flow shop scheduling with an availability constraint [J].
Breit, J .
INFORMATION PROCESSING LETTERS, 2004, 90 (06) :273-278
[8]   Robust scheduling on a single machine using time buffers [J].
Briskorn, Dirk ;
Leung, Joseph ;
Pinedo, Michael .
IIE TRANSACTIONS, 2011, 43 (06) :383-398
[9]   Minimizing job tardiness using integrated preventive maintenance planning and production scheduling [J].
Cassady, CR ;
Kutanoglu, E .
IIE TRANSACTIONS, 2003, 35 (06) :503-513
[10]   An improved heuristic for two-machine flowshop scheduling with an availability constraint [J].
Cheng, TEC ;
Wang, GQ .
OPERATIONS RESEARCH LETTERS, 2000, 26 (05) :223-229