Scheduling of Single-Arm Cluster Tools for an Atomic Layer Deposition Process With Residency Time Constraints

被引:123
作者
Yang, FaJun [1 ]
Wu, NaiQi [2 ,3 ]
Qiao, Yan [2 ]
Zhou, MengChu [4 ,5 ]
Li, ZhiWu [2 ]
机构
[1] Guangdong Univ Technol, Sch Electromech Engn, Dept Ind Engn, Guangzhou 510006, Guangdong, Peoples R China
[2] Macau Univ Sci & Technol, Inst Syst Engn, Macau 999078, Peoples R China
[3] Guangdong Univ Technol, Dept Ind Engn, Guangzhou 510006, Guangdong, Peoples R China
[4] New Jersey Inst Technol, Dept Elect & Comp Engn, Newark, NJ 07102 USA
[5] King Abdulaziz Univ, Renewable Energy Res Grp, Jeddah, Saudi Arabia
来源
IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS | 2017年 / 47卷 / 03期
关键词
Cluster tool; discrete event system; robotic system; scheduling; semiconductor manufacturing; AUTOMATED MANUFACTURING SYSTEMS; HYBRID HEURISTIC-SEARCH; GRIPPER ROBOTIC CELLS; PETRI-NET; DEADLOCK-FREE; THROUGHPUT OPTIMIZATION; PERFORMANCE; SCHEDULABILITY; OPERATIONS; AVOIDANCE;
D O I
10.1109/TSMC.2015.2507140
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In semiconductor manufacturing, there are wafer fabrication processes with wafer revisiting. Some of them must meet wafer residency time constraints. Taking atomic layer deposition (ALD) as a typical wafer revisiting process, this paper studies the challenging scheduling problem of single-arm cluster tools for the ALD process with wafer residency time constraints. It is found that there are only several scheduling strategies that are applicable to this problem and one needs to apply each of them to decide whether a feasible schedule can be found or not. This work, for each applicable strategy, performs the schedulability analysis and derives the schedulability conditions for such tools for the first time. It proposes scheduling algorithms to obtain an optimal schedule efficiently if such conditions are met. It finally gives illustrative examples to show the application of the proposed concepts and approach.
引用
收藏
页码:502 / 516
页数:15
相关论文
共 60 条
  • [1] Identical part production in cyclic robotic cells: Concepts, overview and open questions
    Brauner, Nadia
    [J]. DISCRETE APPLIED MATHEMATICS, 2008, 156 (13) : 2480 - 2492
  • [2] Optimal Scheduling of Multicluster Tools With Constant Robot Moving Times, Part I: Two-Cluster Analysis
    Chan, Wai Kin Victor
    Yi, Jingang
    Ding, Shengwei
    [J]. IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2011, 8 (01) : 5 - 16
  • [3] Optimal Scheduling of Multicluster Tools With Constant Robot Moving Times, Part II: Tree-Like Topology Configurations
    Chan, Wai Kin Victor
    Ding, Shengwei
    Yi, Jingang
    Song, Dezhen
    [J]. IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2011, 8 (01) : 17 - 28
  • [4] Robust optimization for the cyclic hoist scheduling problem
    Che, Ada
    Feng, Jianguang
    Chen, Haoxun
    Chu, Chengbin
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 240 (03) : 627 - 636
  • [5] Cyclic scheduling of identical parts in a robotic cell
    Crama, Y
    Van de Klundert, J
    [J]. OPERATIONS RESEARCH, 1997, 45 (06) : 952 - 965
  • [6] Cyclic scheduling in robotic flowshops
    Crama, Y
    Kats, V
    van de Klundert, J
    Levner, E
    [J]. ANNALS OF OPERATIONS RESEARCH, 2000, 96 (1-4) : 97 - 124
  • [7] On throughput maximization in constant travel-time robotic cells
    Dawande, Milind
    Sriskandarajah, Chelliah
    Sethi, Suresh
    [J]. Manufacturing and Service Operations Management, 2002, 4 (04): : 296 - 312
  • [8] Throughput optimization in dual-gripper interval robotic cells
    Dawande, Milind
    Geismar, H. Neil
    Pinedo, Michael
    Sriskandarajah, Chelliah
    [J]. IIE TRANSACTIONS, 2010, 42 (01) : 1 - 15
  • [9] Dawande MW, 2007, INT SER OPER RES MAN, V101, P1, DOI 10.1007/0-387-70988-6
  • [10] Approximations to optimal k-unit cycles for single-gripper and dual-gripper robotic cells
    Geismar, H. Neil
    Chan, Lap Mui Ann
    Dawande, Milind
    Sriskandarajah, Chelliah
    [J]. PRODUCTION AND OPERATIONS MANAGEMENT, 2008, 17 (05) : 551 - 563