Understanding Operational Availability in Performance-Based Logistics and Maintenance Services

被引:0
作者
Jin, Tongdan [1 ]
Xiang, Yisha [1 ]
Cassady, Richard [1 ]
机构
[1] Texas State Univ, San Marcos, TX 78666 USA
来源
59TH ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM (RAMS) | 2013年
关键词
performance-based contract; Weibull reliability; product-service supply chain; parts availability; RELIABILITY;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Performance-based service contracting is envisioned to reduce the assets ownership cost while ensuring the system performance. Operational availability is considered as the key performance measure to assess the system reliability outcome. This paper presents a unified modeling approach that comprehends eight key performance drivers underpinning the operational availability. These drivers include inherent reliability, usage rate, maintenance, spare parts, fleet size, repair-by-replacement time, and parts repair and reconditioning turn-around times. We investigate the maintenance logistics in a single-site repairable inventory setting, yet the result can be appropriately extended to more complex logistics networks. This study shows that high operational availability could be attained even under low parts availability. This finding is contradictory to the traditional belief that low operational availability is ascribed to excessive parts backorders. The study has the great potentials to shift the service business paradigm from traditional material-based contracting to performance-based contracting.
引用
收藏
页数:6
相关论文
共 50 条
  • [1] Combining RAMS with EEP for performance-based maintenance: a review
    Warsokusumo, Tarwaji
    Prahasto, Toni
    Widodo, Achmad
    JOURNAL OF QUALITY IN MAINTENANCE ENGINEERING, 2021, 27 (01) : 43 - 63
  • [2] Condition-based maintenance under performance-based contracting
    Xiang, Yisha
    Zhu, Zhicheng
    Coit, David W.
    Feng, Qianmei
    COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 111 : 391 - 402
  • [3] Optimizing wind turbine's maintenance policies under performance-based contract
    Wang, Jingjing
    Zhao, Xian
    Guo, Xiaoxin
    RENEWABLE ENERGY, 2019, 135 : 626 - 634
  • [4] Establishment of urban road maintenance model based on performance-based contracts
    Yang, Jyh-Bin
    Tseng, Chun-Chieh
    Chang, Jia-Ruey
    Liu, Chia-Ming
    JOURNAL OF THE CHINESE INSTITUTE OF ENGINEERS, 2023, 46 (03) : 208 - 219
  • [5] Performance-Based Maintenance Contract for Equipments Used in Mining Industry
    Husniah, H.
    Pasaribu, U. S.
    Cakravastia, A.
    Iskandar, B. P.
    2014 IEEE INTERNATIONAL CONFERENCE ON MANAGEMENT OF INNOVATION AND TECHNOLOGY (ICMIT 2014), 2014, : 543 - +
  • [6] A Risk-based Approach to Managing Performance-based Maintenance Contracts
    Jing, Huayi
    Tang, Loon Ching
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2017, 33 (04) : 853 - 865
  • [7] Research on Equipment Maintenance Pricing Model under Performance-based Contracts
    Zhang, Chengyi
    Lin, Mingchi
    CONFERENCE PROCEEDINGS OF THE 6TH INTERNATIONAL SYMPOSIUM ON PROJECT MANAGEMENT (ISPM2018), 2018, : 629 - 635
  • [8] Performance-Based Maintenance Contract for A Fleet of Dump TrucksUsed in Mining Industry
    Iskandar, B. P.
    Cakravastia, A.
    Pasaribu, U. S.
    Husniah, H.
    2014 2ND INTERNATIONAL CONFERENCE ON TECHNOLOGY, INFORMATICS, MANAGEMENT, ENGINEERING, AND ENVIRONMENT (TIME-E 2014), 2014, : 117 - 122
  • [9] Optimal maintenance policy considering maintenance errors for systems operating under performance-based contracts
    Qiu, Qingan
    Cui, Lirong
    Shen, Jingyuan
    Yang, Li
    COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 112 : 147 - 155
  • [10] Adverse Selection and Moral Hazard in Infrastructure Performance-Based Maintenance Contracts
    Lei, Shi
    2012 FIFTH INTERNATIONAL CONFERENCE ON BUSINESS INTELLIGENCE AND FINANCIAL ENGINEERING (BIFE), 2012, : 561 - 566