Evaluation of cutting efficiency during TBM disc cutter excavation within a Korean granitic rock using linear-cutting-machine testing and photogrammetric measurement

被引:223
作者
Cho, Jung-Woo [1 ]
Jeon, Seokwon [2 ]
Jeong, Ho-Young [2 ]
Chang, Soo-Ho [3 ]
机构
[1] Korea Inst Ind Technol, Construct Equipment & Parts R&D Grp, Dalseong Gun 711883, Daegue Si, South Korea
[2] Seoul Natl Univ, Dept Energy Syst Engn, Seoul 151744, South Korea
[3] Korea Inst Construct Technol, Geotech Engn & Tunnelling Res Div, Goyang Si 411712, Gyeonggi Do, South Korea
关键词
Tunnel boring machine (TBM) disc cutter; Rock fragmentation; Linear cutting machine (LCM) test; Photogrammetric measurement; Numerical simulation; NUMERICAL-SIMULATION; FRAGMENTATION; PERFORMANCE; PREDICTION;
D O I
10.1016/j.tust.2012.08.006
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In TBM excavation, estimation of cutting performance is of great importance in design stage as well as during construction. The performance is highly dependent on the geological conditions, i.e. characteristics of rock and discontinuities, and operational conditions, i.e. selection of cutter, cutting forces, cutter spacing, etc. For performance estimation, full scale test is most reliable and accurate since it takes full advantage of using real cutter and real size specimen. Linear cutting machine (LCM) is usually used for a full size test to evaluate the cutting performance. This paper presents the results of LCM tests carried out under various cutting conditions to assess the cutting performance of a TBM disc cutter for granitic rock in Korea. In LCM test, the excavated rock volume was determined by ShapeMetrix3D photogrammetric measurement system. This system was employed to ensure the accurate determination of cutting volume and subsequently calculated specific energy (SE). The optimum cutting condition for the Korean granitic rock was obtained at the minimum value of SE. In addition, three-dimensional numerical analysis was performed to simulate the rock cutting behavior in the LCM test. The results of the numerical simulation were closely comparable with the results of the LCM test. This study presents the cutting performance of a disc cutter by LCM test for a Korean granitic rock and demonstrates the applicability of numerical analysis as an alternative for the prediction of the cutting performance. (C) 2012 Elsevier Ltd. All rights reserved.
引用
收藏
页码:37 / 54
页数:18
相关论文
共 25 条
[1]  
3G Software & Measurement, 2007, SHAPEMETRIX3D US MAN, P1
[2]  
[Anonymous], 1993, P 1993 RAPID EXCAVAT
[3]  
[Anonymous], 2004, Int. J. Rock Mech. Min. Sci., DOI DOI 10.1016/J.IJRMMS.2004.03.094
[4]   Correlative study of linear small and full-scale rock cutting tests to select mechanized excavation machines [J].
Balci, C. ;
Bilgin, N. .
INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2007, 44 (03) :468-476
[5]  
Bruland A., 1998, HARD ROCK TUNNEL BOR
[6]  
Chang Soo-Ho., 2006, Tunnelling and Underground Space Technology, V21, P271, DOI [10.1016/j.tust.2005.12.131, DOI 10.1016/J.TUST.2005.12.131]
[7]  
Cho J.W., 2010, THESIS SEOUL NATL U
[8]   Optimum spacing of TBM disc cutters: A numerical simulation using the three-dimensional dynamic fracturing method [J].
Cho, Jung-Woo ;
Jeon, Seokwon ;
Yu, Sang-Hwa ;
Chang, Soo-Ho .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2010, 25 (03) :230-244
[9]   Disc cutting tests in Colorado red granite: Implications for TBM performance prediction [J].
Gertsch, R. ;
Gertsch, L. ;
Rostami, J. .
INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2007, 44 (02) :238-246
[10]  
Golden Software, 2004, SURFER 8 0 US HELP M