YARD CRANE DISPATCHING TO MINIMIZE VESSEL TURNAROUND TIMES IN CONTAINER TERMINALS

被引:0
|
作者
Huang, Shell Ying [1 ]
Li, Ya [1 ]
Guo, Xi [1 ]
机构
[1] Nanyang Technol Univ, Sch Comp Engn, Singapore 639798, Singapore
来源
PROCEEDINGS OF THE 2014 WINTER SIMULATION CONFERENCE (WSC) | 2014年
关键词
LOADING OUTBOUND CONTAINERS; ALGORITHM; OPERATIONS; OPTIMIZATION; SYSTEMS;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Yard crane (YC) dispatching in the operational planning of container terminals usually aims to minimize makespan of YC operations or waiting time of vehicles. We propose that minimizing the maximum tardiness of vehicle jobs at yard blocks will minimize the operational delay of the longest quay crane (QC). This will minimize vessel turnaround time which is one of the most important objectives of container terminals. A provably optimal algorithm, MMT-RBA* to minimize maximum job tardiness, is presented to sequence the YC jobs. Jobs requiring reshuffling of other containers, often ignored in other studies, are handled by embedded simulation in our optimization algorithms. Another provably optimal algorithm, MMS-RBA* to minimize makespan, is also presented. Simulation experiments confirm that MMT-RBA* significantly outperforms the optimal algorithm RBA* to minimize vehicle waiting time from earlier studies and MMS-RBA* to minimize makespan in minimizing vessel turnaround time.
引用
收藏
页码:1747 / 1758
页数:12
相关论文
共 50 条
  • [21] Solving the Twin Yard Crane Scheduling Problem in Automated Container Terminals
    Oladugba, A. O.
    Gheith, M.
    Eltawil, A.
    2019 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2019, : 1398 - 1402
  • [22] Joint Optimization of Loading Sequence and Yard Crane Travel Route in Container Terminals
    Guo W.-W.
    Ji M.-J.
    Zhu H.-L.
    Wang Q.-B.
    Jiaotong Yunshu Xitong Gongcheng Yu Xinxi/Journal of Transportation Systems Engineering and Information Technology, 2018, 18 (04): : 178 - 187
  • [23] Yard crane scheduling at container terminals: A comparative study of centralized and decentralized approaches
    Omor Sharif
    Nathan Huynh
    Maritime Economics & Logistics, 2012, 14 : 139 - 161
  • [24] Dynamic Space and Time Partitioning for Yard Crane Workload Management in Container Terminals
    Guo, Xi
    Huang, Shell Ying
    TRANSPORTATION SCIENCE, 2012, 46 (01) : 134 - 148
  • [25] Yard crane scheduling at container terminals: A comparative study of centralized and decentralized approaches
    Sharif, Omor
    Huynh, Nathan
    MARITIME ECONOMICS & LOGISTICS, 2012, 14 (02) : 139 - 161
  • [26] A quay crane scheduling method considering interference of yard cranes in container terminals
    Jung, Da Hun
    Park, Young-Man
    Lee, Byung Kwon
    Kim, Kap Hwan
    Ryu, Kwang Ryel
    MICAI 2006: ADVANCES IN ARTIFICIAL INTELLIGENCE, PROCEEDINGS, 2006, 4293 : 461 - +
  • [27] Optimization Approach for Yard Crane Scheduling Problem with Uncertain Parameters in Container Terminals
    Liu, Wenqian
    Zhu, Xiaoning
    Wang, Li
    Yan, Baicheng
    Zhang, Xuewei
    JOURNAL OF ADVANCED TRANSPORTATION, 2021, 2021
  • [28] Integrated Yard Space Allocation and Yard Crane Deployment Problem in Resource-Limited Container Terminals
    Tan, Caimao
    He, Junliang
    SCIENTIFIC PROGRAMMING, 2016, 2016
  • [29] A new solution approach for the twin yard crane scheduling problem in automated container terminals
    Oladugba, Andrew Omoniyi
    Gheith, Mohamed
    Eltawil, Amr
    ADVANCED ENGINEERING INFORMATICS, 2023, 57
  • [30] A comprehensive review of quay crane scheduling, yard operations and integrations thereof in container terminals
    Damla Kizilay
    Deniz Türsel Eliiyi
    Flexible Services and Manufacturing Journal, 2021, 33 : 1 - 42