Analysis of the construction process of cable-stayed bridges built on temporary supports

被引:34
作者
Lozano-Galant, J. A. [1 ]
Paya-Zaforteza, I. [2 ]
Xu, D. [3 ]
Turmo, J. [4 ]
机构
[1] Univ Castilla La Mancha, Dept Civil Engn, E-13071 Ciudad Real, Spain
[2] Univ Politecn Valencia, Inst Ciencia & Tecnol Hormigon ICITECH, Dept Ingn Construcc & Proyectos Ingn Civil, Valencia 46023, Spain
[3] Tongji Univ, Dept Bridge Engn, Shanghai 200092, Peoples R China
[4] Univ Politecn Cataluna, BarcelonaTech, Dept Construct Engn, ES-08034 Barcelona, Spain
关键词
Cable-stayed bridges; Construction process; Temporary supports erection method; Backward modeling;
D O I
10.1016/j.engstruct.2012.02.005
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The temporary supports erection method is a fast and economical way of building cable-stayed bridges. In this method the bridge deck is first erected on a set of temporary and permanent supports and then, the stays are successively placed and tensioned according to a predefined tensioning sequence. A proper definition and analysis of this sequence is very complex as the structure is highly statically indeterminate, exhibits a non linear behavior and has a changing static scheme. Despite its importance, no specific research referring to the modeling of the temporary support erection method has been found as most of the modeling procedures are proposed for the alternative erection technique, the cantilever erection method. The modeling carried out by most of these methods is based on the opposite construction sequence followed on site, this is to say, the structure is disassembled from the desired final stage (Objective Completion Stage, OCS). A procedure, the Backward Algorithm (BA), is formally presented in this paper for calculation of the erection of cable-stayed bridges built on temporary supports. Because of its simplicity the BA can be reproduced by any structural code that enables the modeling of the prestresses of the stays by means of imposed strains or imposed temperature increments. Another advantage is that no separate models are needed to calculate the evolution of stresses in the strands when the strand by strand tensioning technique is used. Furthermore, the stay elongations when prestressed can be easily obtained when the stays are prestressed in a single operation or strand by strand. This information is important to control the correct and safe prestressing of the stay on site. In addition, it also help the designer to control if the anchor wedge bites the strand in the same position several times during the prestressing process. (C) 2012 Elsevier Ltd. All rights reserved.
引用
收藏
页码:95 / 106
页数:12
相关论文
共 35 条
[1]  
[Anonymous], 2010, WIS V1 2 US MAN
[2]   A SUBSTRUCTURE FRONTAL TECHNIQUE FOR CANTILEVER ERECTION ANALYSIS OF CABLE-STAYED BRIDGES [J].
BEHIN, Z ;
MURRAY, DW .
COMPUTERS & STRUCTURES, 1992, 42 (02) :145-157
[3]  
Behin Z., 1990, THESIS U ALBERTA EDM
[4]  
Billington D, 1990, STRUCT ENG, P3101
[5]  
Chen B, 2009, IABSE S BANGK
[6]   Determination of initial cable forces in prestressed concrete cable-stayed bridges for given design deck profiles using the force equilibrium method [J].
Chen, DW ;
Au, FTK ;
Tham, LG ;
Lee, PKK .
COMPUTERS & STRUCTURES, 2000, 74 (01) :1-9
[7]  
Chio G, 2000, THESIS U POLITECNICA
[8]  
Cremer JM, 1999, IABSE S P CABL STAYE
[9]  
Du G.H., 1989, BRIDGE CONSTRUCT, V74, P18
[10]  
Fan LC, 1992, J CHONGQING I T, P1