Evaluation of automation levels for construction change management

被引:19
作者
Karimidorabati, Shahin [1 ]
Haas, Carl T. [2 ]
Gray, Joel [3 ]
机构
[1] Univ Waterloo, Waterloo, ON, Canada
[2] Univ Waterloo, Dept Civil & Environm Engn, Waterloo, ON, Canada
[3] Coreworx Inc, Kitchener, ON, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
Workflow; Change management; Construction; Automated processes; Change documents; Discrete-event simulation; AGENT-BASED SIMULATION; CHANGE ORDERS; PROJECT CHANGE; MODEL; IMPACT; DESIGN; SYSTEM; PERFORMANCE; FRAMEWORK; REWORK;
D O I
10.1108/ECAM-01-2015-0013
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose - Current processes to manage changes are subject to failure since they are heavily dependent on human discipline. The purpose of this paper is to evaluate and quantify the difference between levels of automation of change management processes and to provide input for determining the use of automation systems for change management. Design/methodology/approach - Three generations of change management processes are defined to represent progressive practices used in major capital projects over the past few decades. Discrete event simulation was used to model these processes to capture their behavior and compare their performance according to time and compliance metrics. An oil and gas megaproject served to validate the findings of this modeling and analysis. Findings - The results showed that automated processes can bring more compliance and real-time traceability, but not a significant time reduction in the change process. This contributes to the understanding of the impact of workflow-based automation on construction process performance. The validity of the conclusions are limited by the breadth of sectors studied and the inability to capture off-line time allocations of the personnel involved. Future research may build on the work presented here by studying additional processes such as requests for information, project change notices, requests for scaffolding, and interface management in various industry sectors. Originality/value - A new approach for modeling and evaluating construction management process automation is contributed and the specific results of the paper indicate that automated workflow-based change management processes should be implemented in megaprojects.
引用
收藏
页码:554 / 570
页数:17
相关论文
共 45 条
[11]  
Bertelsen S., 2003, proceedings of IGLC 11
[12]  
Cederman L.E., 1997, EMERGENT ACTORS WORL
[13]  
Charoenngam C., 2003, Construction Innovation (Sage Publications, V3, P197
[14]  
Cooper R., 2005, Process Management in Design and Construction
[15]   Virtual Organizational Imitation for Construction Enterprises: Agent-Based Simulation Framework for Exploring Human and Organizational Implications in Construction Management [J].
Du, Jing ;
El-Gafy, Mohamed .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2012, 26 (03) :282-297
[16]  
Epstein J.M., 1997, GROWING ARTIFICIAL S
[17]  
Fangxiao Liu, 2014, 2014 International Conference on Computing in Civil and Building Engineering. Proceedings, P439
[18]   A system dynamics model for assessing the impacts of design errors in construction projects [J].
Han, Sangwon ;
Love, Peter ;
Pena-Mora, Feniosky .
MATHEMATICAL AND COMPUTER MODELLING, 2013, 57 (9-10) :2044-2053
[19]   Improving design coordination for building projects. I: Information model [J].
Hegazy, T ;
Zaneldin, E ;
Grierson, D .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2001, 127 (04) :322-329
[20]  
Heravi G.H., 2015, J MANAGEMENT ENG, V31, P1, DOI DOI 10.1061/(ASCE)ME.1943-5479