Analysis of Workflow Variability and Its Impacts on Productivity and Performance in Construction of Multistory Buildings

被引:56
作者
Arashpour, Mohammadreza [1 ]
Arashpour, Mehrdad [2 ]
机构
[1] Azad Univ, Fac Engn, Esfahan 14778, Iran
[2] RMIT Univ, Sch Property Construct & Project Management, Melbourne, Vic 3000, Australia
关键词
Construction engineering; Discrete event simulation; Lean production; Multistory buildings; Optimization; Productivity and performance; Project management; Pull and push workflows; Rework; Variability; Workflow stability; MANAGEMENT; PROJECT; INFORMATION; SIMULATION; QUALITY; DESIGN; REWORK; ORGANIZATIONS; BENCHMARKING; DELAY;
D O I
10.1061/(ASCE)ME.1943-5479.0000363
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The meeting of milestones presents a constant challenge in construction projects. One root cause behind this challenge is the presence of variability in the project workflow. In fact, impacts of variability at both the trade contractor level and project level remain difficult to manage. This paper aims to analyze impacts of variability in the workflow caused by rework and fluctuating work quantities. Toward this end, production data of two residential construction companies were collected, and a mixed method of mathematical and simulation modeling was used to analyze performance and productivity at both the trade and project levels. Performance metrics such as completion times, work-in-process levels, and delays were then measured in different real-life production scenarios. The findings clearly show that the workflow variability significantly downgrades performance metrics by causing inflated completion times, longer queues of uncompleted jobs, and excessive delays, resulting in productivity loss. The paper provides those who manage construction projects with recommendations on stabilizing the workflow in the interconnected network of trade contractors to improve productivity and performance. This study contributes to the body of knowledge in engineering management by enhancing the insight into workflow variability and its impacts on tangible performance measures. (C) 2015 American Society of Civil Engineers.
引用
收藏
页数:9
相关论文
共 67 条
  • [1] AbouRizk H., 2009, P 2009 WINT SIM C I
  • [2] Research in Modeling and Simulation for Improving Construction Engineering Operations
    AbouRizk, S.
    Halpin, D.
    Mohamed, Y.
    Hermann, U.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2011, 137 (10) : 843 - 852
  • [4] Need for Alternative Research Approaches in Construction Management: Case of Delay Studies
    AlSehaimi, Abdullah
    Koskela, Lauri
    Tzortzopoulos, Patricia
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2013, 29 (04) : 407 - 413
  • [5] [Anonymous], CIB WORLD BUILD C 20
  • [6] [Anonymous], 2011, THESIS
  • [7] [Anonymous], WINT SIM C I EL EL E
  • [8] A New Approach for Modelling Variability in Residential Construction Projects
    Arashpour, Mehrdad
    Wakefield, Ron
    Blismas, Nick
    Lee, Eric Wai Ming
    [J]. CONSTRUCTION ECONOMICS AND BUILDING, 2013, 13 (02): : 83 - 92
  • [9] Arashpour M, 2012, CONSTR ECON BUILD, V12, P1
  • [10] Optimization of process integration and multi-skilled resource utilization in off-site construction
    Arashpour, Mehrdad
    Wakefield, Ron
    Blismas, Nick
    Minas, James
    [J]. AUTOMATION IN CONSTRUCTION, 2015, 50 : 72 - 80