Comparing Project Performance of Design-Build and Design-Bid-Build Methods for Large-sized Public Apartment Housing Projects in Korea

被引:29
|
作者
Park, Hye-Sung [1 ]
Lee, Donghoon [1 ]
Kim, Sunkuk [1 ]
Kim, Jin-Lee [1 ,2 ]
机构
[1] Kyung Hee Univ, Dept Architectural Engn, Gyeonggi Do, South Korea
[2] Calif State Univ Long Beach, Dept Civil Engn & Construct Engn Management, Long Beach, CA 90840 USA
关键词
project delivery; design-build; design-bid-build; construction management; project performance;
D O I
10.3130/jaabe.14.323
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The project delivery method has a great impact on project performance and construction quality. The numerous studies on the project performance of the two project delivery methods, design-bid-build (DBB) and design-build (DB), have found differing results depending on the project locations, the project types, and the project sizes. Since no previous studies have been conducted with regard to large-sized apartment housing projects, this paper presents the comparative analysis results for the project performance of the DB and DBB methods, focusing on the large-sized public apartment housing projects built in Korea. The project performances considered include cost, cost growth, construction duration, construction duration growth, and quality performance. The cost and schedule performance analysis results show that the cost growth of the DB method is about 5% lower than that of the DBB method and the construction duration is shortened by twelve days per floor. The quality performance analysis results demonstrate that the satisfaction with the DB method is higher in terms of the construction quality and efficiency of the DB method. This paper contributes to the growing body of research into the efficiency of project delivery methods, expanding the body of knowledge for large-sized public apartment housing projects.
引用
收藏
页码:323 / 330
页数:8
相关论文
共 41 条
  • [1] Performance of Design-Build and Design-Bid-Build Projects for Public Universities
    Shrestha, Pramen P.
    Fernane, James D.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2017, 143 (03)
  • [2] Performance Comparison of Large Design-Build and Design-Bid-Build Highway Projects
    Shrestha, Pramen P.
    O'Connor, James T.
    Gibson, G. Edward, Jr.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2012, 138 (01) : 1 - 13
  • [3] Comparing the Performance Quality of Design-Bid-Build and Design-Build Delivery Methods
    Yu, Tao
    Shen, Geoffrey Qiping
    Shi, Qian
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2017, 143 (04)
  • [4] Predicting performance of design-build and design-bid-build projects
    Ling, FYY
    Chan, SL
    Chong, E
    Ee, LP
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2004, 130 (01) : 75 - 83
  • [5] Logistic regression analysis for factors influencing cost performance of design-bid-build and design-build projects
    Lu, Wenxue
    Hua, YuanYuan
    Zhang, SuJuan
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2017, 24 (01) : 118 - 132
  • [6] Comparison of Cost and Time Performance of Design-Build and Design-Bid-Build Delivery Systems in Florida
    Minchin, R. Edward, Jr.
    Li, Xiaoxiao
    Issa, Raja R.
    Vargas, Gary G.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2013, 139 (10)
  • [7] Impact of Design Cost on Project Performance of Design-Bid-Build Road Projects
    Shrestha, Pramen P.
    Mani, Nirajan
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2014, 30 (03)
  • [8] Comparing procurement methods for design-build projects
    El Wardani, MA
    Messner, JI
    Horman, MJ
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2006, 132 (03) : 230 - 238
  • [9] Key determinants of performance of design-bid-build projects in Singapore
    Ling, FYY
    BUILDING RESEARCH AND INFORMATION, 2004, 32 (02) : 128 - 139
  • [10] COMPARING THE PLANNING AND PERFORMANCE OF DIRECT LABOUR AND DESIGN-BID-BUILD CONSTRUCTION PROJECTS IN NIGERIA
    Idoro, Godwin Iroroakpo
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2012, 18 (02) : 184 - 196