Study on the passive refrigeration for main control room of nuclear power plant in power outage accident

被引:5
|
作者
Li, Hao [1 ]
Li, Kuining [1 ]
Liu, Bin [1 ]
Li, Jin [2 ]
Meng, Qianqian [1 ]
Yang, Cheng [1 ]
机构
[1] Chongqing Univ, Coll Power Engn, Minist Educ PRC, Key Lab Low Grade Energy Utilizat Technol & Syst, 174 Shazheng St, Chongqing 400044, Peoples R China
[2] Wuhan Branch Shanghai GM, Dept Purchasing, 8 GM St, Wuhan 430200, Hubei, Peoples R China
关键词
High pressure air; Passive cooling strategy; Throttling refrigeration; Expansion refrigeration; Main control room of nuclear power plant; DESIGN; SAFETY; SYSTEM; HEAT; STORAGE; ENERGY; CYCLE;
D O I
10.1016/j.nucengdes.2017.11.022
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
High-pressure air with room temperature can be used for refrigeration through isentropic expansion or isenthalpic throttling process with no power supplying, which can also meet the demands of oxygen supplying for operators in the insulated situation. Two passive cooling strategies for high-pressure air are proposed: one is throttling refrigeration, and the other is expansion refrigeration, which can provide an effective method to ensure the safety of operators in main control room when an emergency occurs in nuclear power plant. Comparisons between the two passive cooling strategies are done by theoretical and experimental methods, and the cooling effects for both strategies are analyzed. The results show that the passive cooling strategy of isentropic expansion can meet the both requirements of cooling and clean air supplying for the main control room when emergencies occur in nuclear plants, with the minimum cooling capacity of 3000 W.
引用
收藏
页码:183 / 189
页数:7
相关论文
共 50 条
  • [11] Research on An Operation Monitoring and Evaluation Technology for Advanced Main Control Room of Nuclear Power Plant
    Zhao, Yang
    Li, Wei
    Zhou, Ling
    Xiong, Yan
    Jian, Yifan
    Cheng, Minghu
    2018 INTERNATIONAL CONFERENCE ON POWER SYSTEM TECHNOLOGY (POWERCON), 2018, : 4794 - 4797
  • [12] Research on Operation Evaluation System Technology for Digital Main Control Room of Nuclear Power Plant
    Qing X.
    Zhao Y.
    Li W.
    Xiao P.
    Jian Y.
    Chen M.
    Tang T.
    Hedongli Gongcheng/Nuclear Power Engineering, 2020, 41 : 41 - 44
  • [13] Fire simulation in the main control room of Bushehr nuclear power plant using CFAST software
    Mojab, Sahar
    Zarifi, Ehsan
    Ganjaroodi, Saeed Zare
    Jahanfarnia, Gholamreza
    ATOMIC ENERGY, 2023, 134 (5-6) : 391 - 396
  • [15] Research on KRT Monitoring Instrument Alarm Threshold in Main Control Room of Nuclear Power Plant
    Zeng Jun
    Yang Jie
    Wang Jianhua
    2019 CHINESE AUTOMATION CONGRESS (CAC2019), 2019, : 4022 - 4025
  • [16] Effects of Internal Leakage Pathwayon Main Control Room Habitable Dose in Accident Condition of Nuclear Power Plants
    Wang Q.
    Wang K.
    Wang J.
    Hedongli Gongcheng/Nuclear Power Engineering, 2020, 41 (05): : 162 - 167
  • [17] Study on Behavior of Work Teams in Digital Main Control Room of Nuclear Power Plants
    Chen Q.
    Zhang L.
    Hu H.
    Qing T.
    Dai L.
    Hedongli Gongcheng/Nuclear Power Engineering, 2019, 40 (04): : 123 - 126
  • [18] Study on comprehensive evaluation model for nuclear power plant control room layout
    Zhu, Yi-Ming
    Liu, Yuan
    Fan, Hui-Xian
    Hedongli Gongcheng/Nuclear Power Engineering, 2010, 31 (03): : 60 - 63
  • [19] Seismic Qualification of a Main Control Board in a Nuclear Power Plant
    Kim, D. I.
    Keum, C. M.
    Cho, S. J.
    Choi, H. O.
    INTERNATIONAL CONFERENCE ON POWER ELECTRONICS AND ENERGY ENGINEERING (PEEE 2015), 2015, : 90 - 93
  • [20] Markov reliability model research of monitoring process in digital main control room of nuclear power plant
    Jiang, Jian-jun
    Zhang, Li
    Wang, Yi-qun
    Peng, Yu-yuan
    Zhang, Kun
    He, Wen
    SAFETY SCIENCE, 2011, 49 (06) : 843 - 851