Optimal stochastic scheduling of hydropower-based compensation for combined wind and photovoltaic power outputs

被引:35
作者
Liu, Weifeng [1 ,2 ,3 ]
Zhu, Feilin [1 ]
Zhao, Tongtiegang [4 ]
Wang, Hao [2 ,5 ]
Lei, Xiaohui [2 ,5 ]
Zhong, Ping-an [1 ]
Fthenakis, Vasilis [3 ]
机构
[1] Hohai Univ, Coll Hydrol & Water Resources, Nanjing, Peoples R China
[2] China Inst Water Resources & Hydropower Res, State Key Lab Simulat & Regulat Water Cycle River, Beijing, Peoples R China
[3] Columbia Univ, Ctr Life Cycle Anal, New York, NY USA
[4] Sun Yat Sen Univ, Sch Civil Engn, Guangzhou, Peoples R China
[5] Northeastern Univ, Sci & Technol Innovat Ctr Smart Water, Shenyang, Peoples R China
基金
中国国家自然科学基金; 中国博士后科学基金;
关键词
Wind-photovoltaic-hydropower system; Optimal stochastic scheduling; Forecast uncertainty; Uncertainty evaluation; MULTIOBJECTIVE OPTIMIZATION; UNIT COMMITMENT; UNCERTAINTY ANALYSIS; RENEWABLE ENERGY; SYSTEMS; EVOLUTION; OPERATION; NETWORK; DEMAND; MODEL;
D O I
10.1016/j.apenergy.2020.115501
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
This paper examines and quantifies the evolution of the uncertainty in forecasting solarand wind-based electricity generation compensated with hydroelectric power, based on the forecast uncertainties of the three constituents. We used the generalized martingale model of forecast evolution to separately describe the uncertainties of power outputs of wind and photovoltaic systems in the same region. We then superimposed the separate power outputs to obtain the combined power output from these variable renewable energies (VRE). Furthermore, we developed a stochastic recourse model for optimally scheduling hydropower dispatch to compensate VRE and meet scheduled power demands. We applied the new model to hourly performance data obtained from photovoltaic, wind, and hydropower plants with power outputs of 3.1 GW, 2.7 GW, and 3.3 GW, respectively, in the Yalong River Basin in China. Based on the variance of hourly power outputs during spring days with different weather patterns, we found that the uncertainty of the forecasted combined power output of wind and photovoltaic systems is 46% less than that of the forecasted wind power output, and approximately 2% greater than that of the forecasted photovoltaic power output. After hydropower compensated for the power shortage in the combined VRE power output, the uncertainty of meeting prescheduled hourly demand during each of the considered days was reduced by 90%, compared with that without hydropower compensation. When the forecasts were updated dynamically, the uncertainties of the forecasts of the separate power outputs, of the combined power output, and of the power shortage decreased substantially. Thus, the approach proposed in this study offers a scheduling plan for hydropower compensation of VRE on a daily time scale and can also be used to evaluate the risk of power shortage.
引用
收藏
页数:18
相关论文
共 40 条
[1]   How to simulate normal data sets with the desired correlation structure [J].
Arteaga, Francisco ;
Ferrer, Alberto .
CHEMOMETRICS AND INTELLIGENT LABORATORY SYSTEMS, 2010, 101 (01) :38-42
[2]   Time Adaptive Conditional Kernel Density Estimation for Wind Power Forecasting [J].
Bessa, Ricardo J. ;
Miranda, Vladimiro ;
Botterud, Audun ;
Wang, Jianhui ;
Constantinescu, Emil M. .
IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, 2012, 3 (04) :660-669
[3]   Time-adaptive quantile-copula for wind power probabilistic forecasting [J].
Bessa, Ricardo J. ;
Miranda, V. ;
Botterud, A. ;
Zhou, Z. ;
Wang, J. .
RENEWABLE ENERGY, 2012, 40 (01) :29-39
[4]   On the suitability of offshore wind energy resource in the United States of America for the 21st century [J].
Costoya, X. ;
deCastro, M. ;
Carvalho, D. ;
Gomez-Gesteira, M. .
APPLIED ENERGY, 2020, 262
[5]   Climate change impacts on future photovoltaic and concentrated solar power energy output [J].
Crook, Julia A. ;
Jones, Laura A. ;
Forster, Piers M. ;
Crook, Rolf .
ENERGY & ENVIRONMENTAL SCIENCE, 2011, 4 (09) :3101-3109
[6]   A new approach to quantify reserve demand in systems with significant installed wind capacity [J].
Doherty, R ;
O'Malley, M .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2005, 20 (02) :587-595
[7]   Optimal sizing of utility-scale photovoltaic power generation complementarily operating with hydropower: A case study of the world's largest hydro-photovoltaic plant [J].
Fang, Wei ;
Huang, Qiang ;
Huang, Shengzhi ;
Yang, Jie ;
Meng, Erhao ;
Li, Yunyun .
ENERGY CONVERSION AND MANAGEMENT, 2017, 136 :161-172
[8]  
Fthenakis V, 2014, 2014 IEEE 40TH PHOTOVOLTAIC SPECIALIST CONFERENCE (PVSC), P1424, DOI 10.1109/PVSC.2014.6925184
[9]   MODELING THE EVOLUTION OF DEMAND FORECASTS WITH APPLICATION TO SAFETY STOCK ANALYSIS IN PRODUCTION DISTRIBUTION-SYSTEMS [J].
HEATH, DC ;
JACKSON, PL .
IIE TRANSACTIONS, 1994, 26 (03) :17-30
[10]   Improved gravitational search algorithm for unit commitment considering uncertainty of wind power [J].
Ji, Bin ;
Yuan, Xiaohui ;
Chen, Zhihuan ;
Tian, Hao .
ENERGY, 2014, 67 :52-62