Quantifying Performance for the Integrated Project Delivery System as Compared to Established Delivery Systems

被引:155
作者
El Asmar, Mounir [1 ]
Hanna, Awad S. [2 ]
Loh, Wei-Yin [3 ]
机构
[1] Arizona State Univ, Sch Sustainable Engn & Built Environm, Tempe, AZ 85287 USA
[2] Univ Wisconsin, Dept Civil & Environm Engn, Madison, WI 53706 USA
[3] Univ Wisconsin, Dept Stat, Madison, WI 53706 USA
关键词
Project delivery; Innovation; Construction management; Integrated project delivery; Innovative delivery methods; Performance metrics; Contracting;
D O I
10.1061/(ASCE)CO.1943-7862.0000744
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Integrated project delivery (IPD) is an emerging construction project delivery system that collaboratively involves key participants very early in the project timeline, often before the design is started. It is distinguished by a multiparty contractual agreement that typically allows risks and rewards to be shared among project stakeholders. Because IPD is becoming increasingly popular, various organizations are expressing interest in its benefits to the architecture/engineering/construction (AEC) industry. However, no research studies have shown statistically significant performance differences between IPD and more established delivery systems. This study fills that missing gap by evaluating the performance of IPD projects compared to projects delivered using the more traditional design-bid-build, design-build, and construction management at-risk systems, and showing statistically significant improvements for IPD. Relevant literature was analyzed, and a data collection instrument was developed and utilized in detailed interviews to gather quantitative performance data from 35 recently completed projects. Univariate data analyses, such as t-tests and Mann-Whitney-Wilcoxon tests, were performed to evaluate IPD performance. The results indicate that IPD achieves statistically significant improvements in 14 metrics across six performance areas: quality, schedule, project changes, communication among stakeholders, environmental, and financial performance. The major contribution of this paper is demonstrating that IPD provides higher quality facilities faster and at no significant cost premium. These results would be extremely valuable in the hands of decision makers to enable them to choose the appropriate delivery system for their projects.
引用
收藏
页数:14
相关论文
共 28 条
  • [1] Allen J., 2007, One Big Idea for Construction Delivery: Risk Realignment
  • [2] [Anonymous], INJ ILLN FAT
  • [3] [Anonymous], IPD CAS STUD
  • [4] Ballard G, 2011, 2711 CONSTR IND I
  • [5] Bennett J., 1996, DESIGNING BUILDING W
  • [6] Framework of success criteria for design/build projects
    Chan, APC
    Scott, D
    Lam, EWM
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2002, 18 (03) : 120 - 128
  • [7] Construction Industry Institute, 2001, 15811 CONSTR IND I
  • [8] Construction Users Roundtable Collaboration, 2004, CONSTR US ROUNDT PUB, VWP-1202
  • [9] CURT, 2007, WP1004A CURT
  • [10] Construction delivery systems: A comparative analysis of their performance within school districts
    Debella, David Col
    Ries, Robert
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2006, 132 (11): : 1131 - 1138