Grid Integration of Intermittent Wind Generation: A Markovian Approach

被引:48
作者
Luh, Peter B. [1 ]
Yu, Yaowen [1 ]
Zhang, Bingjie [1 ]
Litvinov, Eugene [2 ]
Zheng, Tongxin [2 ]
Zhao, Feng [2 ]
Zhao, Jinye [2 ]
Wang, Congcong [1 ]
机构
[1] Univ Connecticut, Dept Elect & Comp Engn, Storrs, CT 06269 USA
[2] ISO New England, Business Architecture & Technol, Holyoke, MA 01040 USA
基金
美国国家科学基金会;
关键词
Grid integration; intermittent wind generation; Markov process; unit commitment; CONSTRAINED UNIT COMMITMENT; ROBUST OPTIMIZATION; SCENARIO REDUCTION; POWER-GENERATION; SECURITY; SIMULATIONS;
D O I
10.1109/TSG.2013.2268462
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Although the unique characteristics of intermittent wind generation have been acknowledged and drastic impacts of sudden wind drops have been experienced, no effective integration approach has been developed. In this paper, without considering transmission capacity constraints for simplicity, aggregated wind generation is modeled as a discrete Markov process with state transition matrices established based on historical data. Wind generation is then integrated into system demand with multiple net demand levels at each hour. To accommodate the uncertain net demand, a stochastic unit commitment problem is formulated based on states instead of scenarios. The objective is to minimize the total commitment cost of conventional generators and their total expected dispatch cost while satisfying all possible net demand levels. The advantage of this formulation is that the state at a time instant summarizes the information of all previous instants in a probabilistic sense for reduced complexity. With state transition probabilities given, state probabilities calculated before optimization, and the objective function and constraints formulated in a linear manner, the problem is effectively solved by using branch-and-cut. Numerical testing shows that the new Markovian approach is effective and robust through the examined cases, resembling the sudden wind drop in Texas in February 2008.
引用
收藏
页码:732 / 741
页数:10
相关论文
共 37 条
[21]  
Heitsch H., 2003, P POW TECH C 2003 IE
[22]  
IBM ILOG, 2012, INTR IBM ILOG CPLEX
[23]  
Jiang R., 2010, Two-stage robust power grid optimization problem
[24]   Robust Unit Commitment With Wind Power and Pumped Storage Hydro [J].
Jiang, Ruiwei ;
Wang, Jianhui ;
Guan, Yongpei .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2012, 27 (02) :800-810
[25]   Tight and Compact MILP Formulation of Start-Up and Shut-Down Ramping in Unit Commitment [J].
Morales-Espana, German ;
Latorre, Jesus M. ;
Ramos, Andres .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2013, 28 (02) :1288-1296
[26]  
Mur-Amada J., 2007, P 9 INT C EL POW QUA
[27]  
National Renewable Energy Laboratory, 2010, E WIND DAT
[28]   Reserve Requirements for Wind Power Integration: A Scenario-Based Stochastic Programming Framework [J].
Papavasiliou, Anthony ;
Oren, Shmuel S. ;
O'Neill, Richard P. .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2011, 26 (04) :2197-2206
[29]   A Stochastic Model for the Optimal Operation of a Wind-Thermal Power System [J].
Pappala, Venkata Swaroop ;
Erlich, Istvan ;
Rohrig, Kurt ;
Dobschinski, Jan .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2009, 24 (02) :940-950
[30]   Uncertainty Management in the Unit Commitment Problem [J].
Ruiz, Pablo A. ;
Philbrick, C. Russ ;
Zak, Eugene ;
Cheung, Kwok W. ;
Sauer, Peter W. .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2009, 24 (02) :642-651