A delayed product differentiation model for cloud manufacturing

被引:17
作者
Yu, Chunyang [1 ]
Mou, Shandong [3 ]
Ji, Yangjian [2 ]
Xu, Xun [4 ]
Gu, Xinjian [2 ]
机构
[1] Zhejiang Univ City Coll, Dept Ind Design, Hangzhou 310015, Zhejiang, Peoples R China
[2] Zhejiang Univ City Coll, Key Lab Adv Mfg Technol Zhejiang Prov, Hangzhou 310027, Zhejiang, Peoples R China
[3] Univ Auckland, Sch Business, Grad Sch Management, Auckland 1142, New Zealand
[4] Univ Auckland, Dept Mech Engn, Auckland 1142, New Zealand
基金
中国国家自然科学基金; 浙江省自然科学基金;
关键词
Cloud manufacturing; Delayed product differentiation; Inventory management; Postponement; MAKE-TO-ORDER; FORM POSTPONEMENT; QUEUING MODEL; SUPPLY CHAIN; RESOURCE; INDUSTRIES; DESIGN;
D O I
10.1016/j.cie.2018.01.019
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Cloud manufacturing (CMfg) enables in-depth customization but raises demand uncertainties. Delayed product differentiation (DPD) is one attempt to solve such problem. However, current DPD approaches are mostly focused on the production of a dominant company, which tend to hold the supply chains with fixed network structures. Nevertheless, CMfg requires more flexible structures (agile supply chain) to facilitate multiple manufacturers to access external resources with various manners. Therefore, linking DPD to CMfg becomes an important research topic, and the paper proposes an optimization model, namely DPDCM, for such purpose. The model is established on the basis of integrating the order-release, generic inventory and sourcing decisions, and is formulated as an integer programming problem, to meet diverse requirements of companies for carrying out DPD in CMfg environment. Case studies on bicycle and industrial-transformer manufacturing have been applied and analyzed, in which genetic algorithm is adopted to obtain near-optimal solutions. It validates the effectiveness, flexibility and universality of DPDCM.
引用
收藏
页码:60 / 70
页数:11
相关论文
共 45 条
[1]  
Adamson G., 2013, ASME 2013 INT MAN SC
[2]   Assembly systems layout design model for delayed products differentiation [J].
AlGeddawy, Tarek ;
ElMaraghy, Hoda .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (18) :5281-5305
[3]   A cloud-based collaborative manufacturing resource sharing services [J].
Ding, Bo ;
Yu, Xiao-Yang ;
Sun, Li-Juan .
Information Technology Journal, 2012, 11 (09) :1258-1264
[4]   Implementation of delayed differentiation in batch process industries: a standardization problem [J].
Caux, C. ;
David, F. ;
Pierreval, H. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2006, 44 (16) :3243-3255
[5]   A flexible QoS-aware Web service composition method by multi-objective optimization in cloud manufacturing [J].
Chen, Fuzan ;
Dou, Runliang ;
Li, Minqiang ;
Wu, Harris .
COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 99 :423-431
[6]  
Chen SH, 2006, INT J ADV MANUF TECH, V28, P445, DOI 10.1007/S00170-004-2401-3
[7]  
de Kok AG, 2003, HDBK OPER R, V11, P1
[8]  
Feitzinger E, 1997, HARVARD BUS REV, V75, P116
[9]   Form postponement effects on operational performance: a typological theory [J].
Forza, Cipriano ;
Salvador, Fabrizio ;
Trentin, Alessio .
INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 2008, 28 (11-12) :1067-1094
[10]   Make-to-order, make-to-stock, or delay product differentiation? A common framework for modeling and analysis [J].
Gupta, D ;
Benjaafar, S .
IIE TRANSACTIONS, 2004, 36 (06) :529-546