Integrated quality strategy in production and raw material replenishment in a manufacturing-oriented supply chain

被引:14
作者
Hlioui, Rached [1 ]
Gharbi, Ali [1 ]
Hajji, Adnene [2 ,3 ]
机构
[1] Univ Quebec, Ecole Technol Super, Dept Automated Prod Engn, Prod Syst & Control Lab, Montreal, PQ H3C 3P8, Canada
[2] Univ Laval, Dept Operat & Decis Syst, Quebec City, PQ, Canada
[3] Univ Laval, CIRRELT, Quebec City, PQ, Canada
关键词
Stochastic optimal control; Supply chain; Imperfect quality; Sampling plan; Manufacturing; Simulation; RSM; PRODUCTION-INVENTORY MODEL; IMPERFECT QUALITY; INSPECTION POLICIES; DEMAND; SYSTEMS; TIME;
D O I
10.1007/s00170-015-7177-0
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper deals with the coordination of production, replenishment and inspection decisions for a manufacturing-oriented supply chain with a failure-prone transformation stage, random lead time and imperfect delivered lots. Upon reception of the lot, the manufacturer executes an acceptance sampling plan with a zero non-conforming criterion. If the sample does not contain non-conforming items, the lot is accepted; otherwise, it is rejected. In this work, two strategies regarding the refused sampled lot are studied. The first one involves a return of the lot to the supplier, who commits to improving the quality of the lot, while the second assumes that the manufacturer performs a 100 % inspection and rectification operation. This work presents two main objectives. The first one is to jointly optimize, in a stochastic and dynamic context, the ordering point of raw material, the lot size of raw material, the final product inventory threshold and the severity of the sampling plan using a simulation-based optimization approach. The second one is to determine the best of the two quality control strategies. The in-depth study has shown that no strategy could be preferred in all the cases. For this reasons, we present an easy decision-making tool (indifference curves) to help the manager select the best quality control strategy when considering the entire supply chain.
引用
收藏
页码:335 / 348
页数:14
相关论文
共 34 条
[1]  
[Anonymous], 2006, Simulation modeling and analysis
[2]  
[Anonymous], 2013, DESIGN ANAL EXPT
[3]   Joint production and subcontracting planning of unreliable multi-facility multi-product production systems [J].
Assid, M. ;
Gharbi, A. ;
Dhouib, K. .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2015, 50 :54-69
[4]  
Assid M, 2014, INT J ADV MANUF TECH, P1
[5]   Integrated inventory and inspection policies for stochastic demand [J].
Ben-Daya, M. ;
Noman, S. M. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 185 (01) :159-169
[6]   Integrated inventory control and inspection policies with deterministic demand [J].
Ben-Daya, M ;
Noman, SM ;
Hariga, M .
COMPUTERS & OPERATIONS RESEARCH, 2006, 33 (06) :1625-1638
[7]   Environmental issue in an alternative production-maintenance control for unreliable manufacturing system subject to degradation [J].
Ben-Salem, Ali ;
Gharbi, Ali ;
Hajji, Adnene .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2015, 77 (1-4) :383-398
[8]   Joint hybrid repair and remanufacturing systems and supply control [J].
Berthaut, F. ;
Gharbi, A. ;
Pellerin, R. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (14) :4101-4121
[9]   Joint optimal lot sizing and production control policy in an unreliable and imperfect manufacturing system [J].
Bouslah, Bassem ;
Gharbi, Ali ;
Pellerin, Robert .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 144 (01) :143-156
[10]   Investigating design of zero acceptance number single sampling plans with inspection errors [J].
Chattinnawat, Wichai .
INTERNATIONAL JOURNAL OF QUALITY & RELIABILITY MANAGEMENT, 2013, 30 (06) :662-+