Treatment Wetland Aeration without Electricity? Lessons Learned from the First Experiment Using a Wind-Driven Air Pump

被引:14
作者
Boog, Johannes [1 ]
Nivala, Jaime [1 ]
Aubron, Thomas [1 ]
Wallace, Scott [2 ]
Sullivan, Christopher [3 ]
van Afferden, Manfred [1 ]
Mueller, Roland A. [1 ]
机构
[1] Environm & Biotechnol Ctr UBZ, Helmholtz Ctr Environm Res UFZ, Permoserstr 15, D-04318 Leipzig, Germany
[2] Nat Wallace Consulting LLC, 7801 Vauxhill Dr,POB 99587, Raleigh, NC 27624 USA
[3] Reg Dev Victoria, 121 Exhibit St, Melbourne, Vic 3000, Australia
关键词
aerated wetland; treatment wetland; domestic wastewater; horizontal flow; energy demand; WASTE-WATER TREATMENT; CONSTRUCTED WETLANDS; ARTIFICIAL AERATION; NITROGEN REMOVAL; TREATMENT EFFICIENCY; NITRIFICATION; DESIGN;
D O I
10.3390/w8110502
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Aerated treatment wetlands have become an increasingly recognized technology for treating wastewaters from domestic and various industrial origins. To date, treatment wetland aeration is provided by air pumps which require access to the energy grid. The requirement for electricity increases the ecological footprint of an aerated wetland and limits the application of this technology to areas with centralized electrical infrastructure. Wind power offers another possibility as a driver for wetland aeration, but its use for this purpose has not yet been investigated. This paper reports the first experimental trial using a simple wind-driven air pump to replace the conventional electric air blowers of an aerated horizontal subsurface flow wetland. The wind-driven air pump was connected to a two-year old horizontal flow aerated wetland which had been in continuous (24 h) aeration since startup. The wind-driven aeration system functioned, however it was not specifically adapted to wetland aeration. As a result, treatment performance decreased compared to prior continuous aeration. Inconsistent wind speed at the site may have resulted in insufficient pressure within the aeration manifold, resulting in insufficient air supply to the wetland. This paper discusses the lessons learned during the experiment.
引用
收藏
页数:12
相关论文
共 23 条
[1]  
[Anonymous], 2014, R LANG ENV STAT COMP
[2]  
[Anonymous], 2008, R NEWS
[3]  
Aubron R.T., 2015, P 6 INT S WETL POLL
[4]   Energy requirements for nitrification and biological nitrogen removal in engineered wetlands [J].
Austin, David ;
Nivala, Jaime .
ECOLOGICAL ENGINEERING, 2009, 35 (02) :184-192
[5]  
Boog J., 2013, EFFECT AERATION SCHE
[6]   Hydraulic characterization and optimization of total nitrogen removal in an aerated vertical subsurface flow treatment wetland [J].
Boog, Johannes ;
Nivala, Jaime ;
Aubron, Thomas ;
Wallace, Scott ;
van Afferden, Manfred ;
Mueller, Roland Arno .
BIORESOURCE TECHNOLOGY, 2014, 162 :166-174
[7]   Effect of artificial aeration on tertiary nitrification in a full-scale subsurface horizontal flow constructed wetland [J].
Butterworth, E. ;
Dotro, G. ;
Jones, M. ;
Richards, A. ;
Onunkwo, P. ;
Narroway, Y. ;
Jefferson, B. .
ECOLOGICAL ENGINEERING, 2013, 54 :236-244
[8]  
Fan J., 2012, ENVIRON SCI POLLUT R, V20, P2448
[9]   Recirculation or artificial aeration in vertical flow constructed wetlands: A comparative study for treating high load wastewater [J].
Foladori, Paola ;
Ruaben, Jenny ;
Ortigara, Angela R. C. .
BIORESOURCE TECHNOLOGY, 2013, 149 :398-405
[10]   Escherichia coli removal and internal dynamics in subsurface flow ecotechnologies: Effects of design and plants [J].
Headley, Tom ;
Nivala, Jaime ;
Kassa, Kinfe ;
Olsson, Linda ;
Wallace, Scott ;
Brix, Hans ;
van Afferden, Manfred ;
Mueller, Roland .
ECOLOGICAL ENGINEERING, 2013, 61 :564-574