Short-term Power Forecasting of Small-scale hydropower based on Projection Pursuit Algorithm
被引:0
作者:
Liu, Wenxia
论文数: 0引用数: 0
h-index: 0
机构:
North China Elect Power Univ, Transmiss & Distribut Syst Res Inst, Beijing, Peoples R ChinaNorth China Elect Power Univ, Transmiss & Distribut Syst Res Inst, Beijing, Peoples R China
Liu, Wenxia
[1
]
Zhou, Xi
论文数: 0引用数: 0
h-index: 0
机构:
North China Elect Power Univ, Transmiss & Distribut Syst Res Inst, Beijing, Peoples R ChinaNorth China Elect Power Univ, Transmiss & Distribut Syst Res Inst, Beijing, Peoples R China
Zhou, Xi
[1
]
Xu, Xiaobo
论文数: 0引用数: 0
h-index: 0
机构:
North China Elect Power Univ, Transmiss & Distribut Syst Res Inst, Beijing, Peoples R ChinaNorth China Elect Power Univ, Transmiss & Distribut Syst Res Inst, Beijing, Peoples R China
Xu, Xiaobo
[1
]
Xu, Meimei
论文数: 0引用数: 0
h-index: 0
机构:North China Elect Power Univ, Transmiss & Distribut Syst Res Inst, Beijing, Peoples R China
Xu, Meimei
机构:
[1] North China Elect Power Univ, Transmiss & Distribut Syst Res Inst, Beijing, Peoples R China
来源:
INDUSTRIAL INSTRUMENTATION AND CONTROL SYSTEMS II, PTS 1-3
|
2013年
/
336-338卷
Compared with other traditional energy, the small-scale hydropower which is intermittent energy can not be stored and scheduled. The greater fluctuant of the output power of small-scale hydropower leads to great difficult to the operation of the power system. Most of the existing small-scale hydropower forecasting is considered as the load forecasting factors, and there is not effective forecasting method. This paper establishes an output power forecasting model of the small-scale hydropower based on Projection Pursuit. The simulation results show that the new algorithm has a strong practical application in the small-scale hydropower output power forecasting and the forecast accuracy meets the scheduling requirements.