New Ariane 5 delays mar catchup plan

被引:0
|
作者
Taverna, MA
机构
来源
AVIATION WEEK & SPACE TECHNOLOGY | 1999年 / 151卷 / 12期
关键词
D O I
暂无
中图分类号
V [航空、航天];
学科分类号
08 ; 0825 ;
摘要
引用
收藏
页码:44 / 44
页数:1
相关论文
共 50 条
  • [11] ARIANE 5 - The software reliability verification process: The ARIANE 5 example
    Lacan, P
    Monfort, JN
    Ribal, LVQ
    Deutsch, A
    Gonthier, G
    DATA SYSTEMS IN AEROSPACE - PROCEEDINGS, 1998, : 201 - 205
  • [12] ARIANE-4 AND ARIANE-5 LAUNCHERS
    LAPORTEWEYWADA, H
    ONDE ELECTRIQUE, 1992, 72 (06): : 60 - 65
  • [13] Why Ariane 5
    不详
    RECHERCHE, 1996, (289): : 5 - 5
  • [14] A new Large Slip Table to vibrate ARIANE 5 payloads
    Touzelet, P
    Brunner, O
    Popovitch, A
    4TH INTERNATIONAL SYMPOSIUM ON ENVIRONMENTAL TESTING FOR SPACE PROGRAMMES, PROCEEDINGS, 2001, 467 : 319 - 323
  • [15] ARIANE-5 AND COLUMBUS SPEARHEAD NEW ESA PROGRAM
    OWEN, K
    AEROSPACE AMERICA, 1985, 23 (04) : 24 - 24
  • [16] Spatial Europe - has she lost the Ariane plan?
    Bartholome, Pierre
    Revue HF Tijdschrift, 1996, (03): : 43 - 56
  • [17] Ariane 5 picked for WildBlue as ariane 4 is phased out
    Taverna, Michael A.
    Aviation Week and Space Technology (New York), 2003, 158 (08):
  • [18] Ariane 5 picked for WildBlue as Ariane 4 is phased out
    Taverna, MA
    AVIATION WEEK & SPACE TECHNOLOGY, 2003, 158 (08): : 31 - 31
  • [19] Ariane-5 delayed
    不详
    NEW SCIENTIST, 2005, 188 (2526) : 5 - 5
  • [20] Ariane 5: Who dunnit?
    Nuseibeh, B
    IEEE SOFTWARE, 1997, 14 (03) : 15 - 16