An efficient network-based formulation for sequence dependent setup scheduling on parallel identical machines

被引:15
作者
Anderson, Bradley E. [1 ]
Blocher, James D. [2 ]
Bretthauer, Kurt M. [2 ]
Venkataramanan, Munirpallam A. [2 ]
机构
[1] USAF, Dept Operat Sci, Inst Technol, Wright Patterson AFB, OH 45433 USA
[2] Indiana Univ, Dept Operat & Decis Technol, Kelley Sch Business, Bloomington, IN 47405 USA
关键词
Sequence-dependent setups; Scheduling; Mixed integer programming; Earliness; Tardiness; MULTIPLE TIME WINDOWS; TARDINESS PENALTIES; EARLINESS;
D O I
10.1016/j.mcm.2012.06.029
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper compares the efficacy of a newly developed network-based mixed-integer programming (MIP) formulation with three existing formulations for the sequence dependent setup scheduling problem with earliness/tardiness penalties. This research shows that the new model is more efficient in terms of computation time for larger multi-machine problems than the existing formulations of these problems. The mixed-integer nature of the formulation allows companies to solve this class of problems with any one of many commonly available integer programming software packages. The presented MIP formulation provides a unique and useful method of conceptualizing and modeling a practical, yet difficult, problem within industry. Published by Elsevier Ltd
引用
收藏
页码:483 / 493
页数:11
相关论文
共 10 条
[1]  
Baker K. R., 1974, Introduction to Sequencing and Scheduling"
[2]   Early/tardy scheduling with sequence dependent setups on uniform parallel machines [J].
Balakrishnan, N ;
Kanet, JJ ;
Sridharan, V .
COMPUTERS & OPERATIONS RESEARCH, 1999, 26 (02) :127-141
[4]   Robust ship scheduling with multiple time windows [J].
Christiansen, M ;
Fagerholt, K .
NAVAL RESEARCH LOGISTICS, 2002, 49 (06) :611-625
[5]  
Coleman B. J., 1992, Production and Operations Management, V1, P225, DOI 10.1111/j.1937-5956.1992.tb00354.x
[6]  
Panwalkar S.S., 1973, S THEORY SCHEDULING, P29
[7]   On the flexibility of constraint programming models: From single to multiple time windows for the traveling salesman problem [J].
Pesant, G ;
Gendreau, M ;
Potvin, JY ;
Rousseau, JM .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 117 (02) :253-263
[8]   Parallel machine scheduling with earliness and tardiness penalties [J].
Sivrikaya-Serifoglu, F ;
Ulusoy, G .
COMPUTERS & OPERATIONS RESEARCH, 1999, 26 (08) :773-787
[9]   Scheduling and lot sizing with sequence-dependent setup: A literature review [J].
Zhu, Xiaoyan ;
Wilhelm, Wilbert E. .
IIE TRANSACTIONS, 2006, 38 (11) :987-1007
[10]   Minimizing the sum of earliness/tardiness in multi-machine scheduling: a mixed integer programming approach [J].
Zhu, ZW ;
Heady, RB .
COMPUTERS & INDUSTRIAL ENGINEERING, 2000, 38 (02) :297-305