Flexible maintenance within a continuous-time state-task network framework

被引:6
作者
Hazaras, Matthew J. [1 ]
Swartz, Christopher L. E. [1 ]
Marlin, Thomas E. [1 ]
机构
[1] McMaster Univ, Dept Chem Engn, Hamilton, ON L8S 4L7, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
Scheduling; State-task network; Flexible maintenance; Continuous-time formulation; MULTIPURPOSE BATCH PROCESSES; SINGLE-MACHINE; NONRESUMABLE JOBS; FORMULATION; PLANTS;
D O I
10.1016/j.compchemeng.2012.06.028
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Preventative maintenance is common in industry and aids in sustaining reliable process operations. If maintenance is executed within the production schedule, it imposes restrictions on the shared resources of the manufacturing facility. In multipurpose batch plants, these restrictions can affect many product pathways and have a significant impact on plant profitability. The combined optimization of process maintenance and production scheduling should therefore exploit the inherent flexibility of such plants and provide solutions with the highest profitability. This paper presents a mathematical model capable of addressing the combined scheduling of maintenance and production tasks within a continuous-time state-task network based framework. Multiple maintenance types are addressed within the framework. The proposed formulation is illustrated on an adaptation of a well cited literature problem, and the benefit of combined maintenance and production scheduling highlighted. (C) 2012 Elsevier Ltd. All rights reserved.
引用
收藏
页码:167 / 177
页数:11
相关论文
共 14 条
[1]   Scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan [J].
Chen, Jen-Shiang .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 190 (01) :90-102
[2]  
Davies K. M., 2008, THESIS MCMASTER U HA
[3]   OPTIMAL SHORT-TERM SCHEDULING OF MAINTENANCE AND PRODUCTION FOR MULTIPURPOSE PLANTS [J].
DEDOPOULOS, IT ;
SHAH, N .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1995, 34 (01) :192-201
[4]   Continuous-time versus discrete-time approaches for scheduling of chemical processes: a review [J].
Floudas, CA ;
Lin, XX .
COMPUTERS & CHEMICAL ENGINEERING, 2004, 28 (11) :2109-2129
[5]   Effective continuous-time formulation for short-term scheduling. 1. Multipurpose batch processes [J].
Ierapetritou, MG ;
Floudas, CA .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1998, 37 (11) :4341-4359
[6]   Enhanced continuous-time unit-specific event-based formulation for short-term scheduling of multipurpose batch processes: Resource constraints and mixed storage policies [J].
Janak, SL ;
Lin, XX ;
Floudas, CA .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2004, 43 (10) :2516-2533
[7]   A GENERAL ALGORITHM FOR SHORT-TERM SCHEDULING OF BATCH-OPERATIONS .1. MILP FORMULATION [J].
KONDILI, E ;
PANTELIDES, CC ;
SARGENT, RWH .
COMPUTERS & CHEMICAL ENGINEERING, 1993, 17 (02) :211-227
[8]   Machine scheduling with an availability constraint [J].
Lee, CY .
JOURNAL OF GLOBAL OPTIMIZATION, 1996, 9 (3-4) :395-416
[9]   Single-machine scheduling with periodic maintenance and nonresumable jobs [J].
Liao, CJ ;
Chen, WJ .
COMPUTERS & OPERATIONS RESEARCH, 2003, 30 (09) :1335-1347
[10]  
Maravelias CT, 2003, COMP AID CH, V15, P274