Resource-Constrained Critical Path Scheduling by a GRASP-Based Hyperheuristic

被引:28
作者
Anagnostopoulos, Konstantinos [1 ]
Koulinas, Georgios [1 ]
机构
[1] Democritus Univ Thrace, Sch Engn, Dept Prod Engn & Management, GR-67100 Xanthi, Greece
关键词
Optimization; Construction management; Scheduling; ANT COLONY OPTIMIZATION; GENETIC ALGORITHMS; CONSTRUCTION PROJECTS; SEARCH;
D O I
10.1061/(ASCE)CP.1943-5487.0000116
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The greedy randomized adaptive search procedure (GRASP) is a well-known computational procedure for handling combinatorial optimization problems. Hyperheuristics, or heuristics to choose heuristics, are higher-level algorithms that operate on low-level heuristics, which in turn work in the solution domain. In this paper, a GRASP-inspired hyperheuristic is proposed for solving the resource-constrained project scheduling problem (RCPSP), one of the most important challenges facing construction project schedulers. The hyperheuristic is the main component of a multilevel procedure that runs within a commercial project management software system. On the basis of simple moves such as "swap" and "replace," the low-level heuristics operate on the priority values that the software uses for scheduling activities. The efficiency of this prioritization-based algorithm has been addressed through a series of computational experiments on randomly generated projects. Moreover, the proposed procedure shows the advantages of utilizing the hyperheuristic approach to deal with optimization problems in the construction field. DOI: 10.1061/(ASCE)CP.1943-5487.0000116. (C) 2012 American Society of Civil Engineers.
引用
收藏
页码:204 / 213
页数:10
相关论文
共 46 条
[1]   GRASP and path relinking for project scheduling under partially renewable resources [J].
Alvarez-Valdes, R. ;
Crespo, E. ;
Tamarit, J. M. ;
Villa, F. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 189 (03) :1153-1170
[2]   A simulated annealing hyperheuristic for construction resource levelling [J].
Anagnostopoulos, Konstantinos P. ;
Koulinas, Georgios K. .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2010, 28 (02) :163-175
[3]  
[Anonymous], ESSAYS SURVEYS METAH
[4]   Resource-Constrained Project Scheduling for Timely Project Completion with Stochastic Activity Durations [J].
Ballestin, Francisco ;
Leus, Roel .
PRODUCTION AND OPERATIONS MANAGEMENT, 2009, 18 (04) :459-474
[5]   SCHEDULING SUBJECT TO RESOURCE CONSTRAINTS - CLASSIFICATION AND COMPLEXITY [J].
BLAZEWICZ, J ;
LENSTRA, JK ;
KAN, AHGR .
DISCRETE APPLIED MATHEMATICS, 1983, 5 (01) :11-24
[6]   Resource-constrained project scheduling by simulated annealing [J].
Boctor, FF .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (08) :2335-2351
[7]   A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version [J].
Bouleimen, K ;
Lecocq, H .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 149 (02) :268-281
[8]   A branch and bound algorithm for the resource-constrained project scheduling problem [J].
Brucker, P ;
Knust, S ;
Schoo, A ;
Thiele, O .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 107 (02) :272-288
[9]  
Burke E, 2005, IEEE C EVOL COMPUTAT, P2263
[10]  
Burke E., 2003, Handbook of Metaheuristicspages, P457, DOI DOI 10.1007/0-306-48056-5_16