Scheduling in aerospace composite manufacturing systems: a two-stage hybrid flow shop problem

被引:16
|
作者
Azami, Aria [1 ]
Demirli, Kudret [1 ,2 ]
Bhuiyan, Nadia [1 ]
机构
[1] Concordia Univ, Dept Mech & Ind Engn, Montreal, PQ H3G 1M8, Canada
[2] Khalifa Univ, Dept Ind & Syst Engn, Abu Dhabi 127788, U Arab Emirates
基金
加拿大自然科学与工程研究理事会;
关键词
Job scheduling; Hybrid flow shop; Mixed integer linear programming; Genetic algorithm; Aerospace composite manufacturing systems; GENETIC-ALGORITHM; SETUP TIME; BOUND ALGORITHM; LIMITED BUFFER; BATCH; CLASSIFICATION; PROCESSORS; MACHINES; FAMILIES; LINES;
D O I
10.1007/s00170-017-1429-0
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This research investigates a real-world complex two-stage hybrid flow shop scheduling problem which is faced during the manufacturing of composite aerospace components. There are a number of new constraints to be taken into account in this special hybrid flow shop, in particular limited physical capacity of the intermediate buffer, limited waiting time between processing stages, and limited tools/molds used in both stages in each production cycle. We propose a discrete-time mixed integer linear programming model with an underlying branch and bound algorithm, to solve small- and medium-size problems (up to 100 jobs). To solve the large instances of the problem (up to 300 jobs), a genetic algorithm with a novel crossover operator is developed. A new heuristic method is introduced to generate the initial population of the genetic algorithm. The results show the high level of computational efficiency and accuracy of the proposed genetic algorithm when compared to the optimal solutions obtained from the mathematical model. The results also show that the proposed genetic algorithm outperforms the conventional dispatching rules (i.e., shortest processing time, earliest dues date and longest processing time) when applied to large-size problems. A real case study undertaken at one of the leading aerospace companies in Canada is used to formulate the model, collect data for the parameters of the model, and analyze the results.
引用
收藏
页码:3259 / 3274
页数:16
相关论文
共 50 条
  • [31] Two-stage hybrid flow shop scheduling with sequence-dependent setup times in semiconductor manufacturing: A customized variable neighborhood search
    Lu, Shaojun
    Zhang, Xujuan
    Kong, Min
    Fathollahi-Fard, Amir M.
    ANNALS OF OPERATIONS RESEARCH, 2025,
  • [32] Evaluation Dispatching Rules for Two-Stage Hybrid Flow Shop Scheduling with Parallel Machines
    Kaweegitbundit, Parinya
    MECHANICAL ENGINEERING AND MATERIALS, PTS 1-3, 2012, 152-154 : 1487 - 1491
  • [33] An Approximation Scheme for Heterogeneous Parallel Task Scheduling in a Two-Stage Hybrid Flow Shop
    Sun, Jinghao
    Meng, Yakun
    JOURNAL OF INFORMATION SCIENCE AND ENGINEERING, 2015, 31 (04) : 1291 - 1308
  • [34] A two-stage flow-shop scheduling problem with incompatible job families and limited waiting time
    Li, Yonglin
    Dai, Zhenhua
    ENGINEERING OPTIMIZATION, 2020, 52 (03) : 484 - 506
  • [35] An efficient imperialist competitive algorithm for scheduling in the two-stage assembly flow shop problem
    Seidgar, Hany
    Kiani, Morteza
    Abedi, Mehdi
    Fazlollahtabar, Hamed
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (04) : 1240 - 1256
  • [36] Scheduling a tempered glass manufacturing system: a three-stage hybrid flow shop model
    Liu, Ming
    Yang, Xuenan
    Zhang, Jiantong
    Chu, Chengbin
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (20) : 6084 - 6107
  • [37] Hybrid Flow Shop with Setup Times Scheduling Problem
    Jemmali, Mahdi
    Hidri, Lotfi
    COMPUTER SYSTEMS SCIENCE AND ENGINEERING, 2023, 44 (01): : 563 - 577
  • [38] ON THE TWO-STAGE HYBRID FLOW SHOP WITH DEDICATED MACHINES
    Hadda, Hatem
    Hajji, Mohamed Karim
    Dridi, Najoua
    RAIRO-OPERATIONS RESEARCH, 2015, 49 (04) : 795 - 804
  • [39] Metaheuristics for two-stage flow-shop assembly problem with a truncation learning function
    Wu, Chin-Chia
    Zhang, Xingong
    Azzouz, Ameni
    Shen, Wei-Lun
    Cheng, Shuenn-Ren
    Hsu, Peng-Hsiang
    Lin, Win-Chin
    ENGINEERING OPTIMIZATION, 2021, 53 (05) : 843 - 866
  • [40] Scheduling a two-stage hybrid flow shop with dedicated machines, time lags and sequence-dependent family setup times
    Harbaoui, H.
    Bellenguez-Morineau, O.
    Khalfallah, S.
    2016 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS (SMC), 2016, : 2990 - 2995