METHODOLOGY FOR SOLVING THE ASSEMBLY SYSTEM RECONFIGURATION PLANNING PROBLEM

被引:0
|
作者
Bryan, A. [1 ]
Hu, S. J. [1 ]
Koren, Y. [1 ]
机构
[1] Univ W Indies, Dept Mech & Mfg Engn, St Augustine, Trinidad Tobago
来源
PROCEEDINGS OF THE ASME INTERNATIONAL MANUFACTURING SCIENCE AND ENGINEERING CONFERENCE 2011, VOL 2 | 2011年
关键词
DESIGN; FAMILIES;
D O I
暂无
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
The need to cost effectively introduce new generations of product families within ever decreasing time frames have led manufacturers to seek product development strategies with a multigenerational outlook. Co-evolution of product families and assembly systems is a methodology that leads to the simultaneous design of several generations of product families and reconfigurable assembly systems that optimize life cycle costs. Two strategies that are necessary for the implementation of the co-evolution of product families and assembly systems methodology are: (1) The concurrent design of product families and assembly systems and (2) Assembly system reconfiguration planning (ASRP). ASRP is used for the determination of the assembly system reconfiguration plans that minimize the cost of producing several generations of product families. More specifically, the objective of ASRP is to minimize the net present cost of producing successive generations of products. This paper introduces a method for finding optimum solutions to the ASRP problem. The solution methodology involves the generation of a staged network of assembly system plans for all the generations that the product family is expected to be produced. Each stage in the network represents a generation that the product family is produced, while each state within a stage represents a potential assembly system configuration. A novel algorithm for generating the states (i.e. assembly system configurations) within each generation is also introduced. A dynamic program is used to find the cost minimizing path through the network. An example is used to demonstrate the implementation of the ASRP methodology.
引用
收藏
页码:111 / 118
页数:8
相关论文
共 50 条
  • [21] An evaluation of constructive heuristic methods for solving the alternative subgraphs assembly line balancing problem
    Capacho, Liliana
    Pastor, Rafael
    Dolgui, Alexander
    Guschinskaya, Olga
    JOURNAL OF HEURISTICS, 2009, 15 (02) : 109 - 132
  • [22] A framework for planning a reconfigurable assembly system for press brake production
    Olabanji, Olayinka Mohammed
    Mpofu, Khumbulani
    INTERNATIONAL JOURNAL OF MANUFACTURING RESEARCH, 2022, 17 (04) : 364 - 388
  • [23] Solving Order Planning Problem Using a Heuristic Approach: The Case in a Building Material Distributor
    Wang, Chia-Nan
    Nguyen, Ngoc-Ai-Thy
    Dang, Thanh-Tuan
    APPLIED SCIENCES-BASEL, 2020, 10 (24): : 1 - 21
  • [24] An Application of Stochastic Programming in Solving Capacity Allocation and Migration Planning Problem under Uncertainty
    Chen, Yin-Yann
    Fan, Hsiao-Yao
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2015, 2015
  • [25] Development of creative problem solving-based framework for site planning in hill areas
    Kapoor, N.
    Bansal, V. K.
    Jain, M.
    FRONTIERS OF ARCHITECTURAL RESEARCH, 2020, 9 (02) : 450 - 466
  • [26] A supervised learning-driven heuristic for solving the facility location and production planning problem
    Wu, Tao
    Huang, Le
    Liang, Zhe
    Zhang, Xiaoning
    Zhang, Canrong
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 301 (02) : 785 - 796
  • [27] A flexible planning methodology for product family assembly line based on improved NSGA_II
    Wu, Yongming
    Zhao, Xudong
    Xu, Yanxia
    Chen, Yuling
    ASSEMBLY AUTOMATION, 2020, 40 (04) : 625 - 639
  • [28] Set Response Surface Methodology and its Application in Solving the Wrinkle and Crack Problem in the Auto Industry
    He, Yingdong
    Ma, Xinyan
    Tian, Yu
    He, Zhen
    Zhang, Xiaoyi
    Kim, Kwang-Jae
    Bae, Young-Mok
    IEEE TRANSACTIONS ON RELIABILITY, 2024,
  • [29] Cyber-physical assembly system-based optimization for robotic assembly sequence planning
    Ying, Kuo-Ching
    Pourhejazy, Pourya
    Cheng, Chen-Yang
    Wang, Chi-Hsin
    JOURNAL OF MANUFACTURING SYSTEMS, 2021, 58 : 452 - 466
  • [30] A multiple single-pass heuristic algorithm solving the stochastic assembly line rebalancing problem
    Gamberini, R.
    Gebennini, E.
    Grassi, A.
    Regattieri, A.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2009, 47 (08) : 2141 - 2164