Integration of Stochastic Programming and Factorial Design for Optimal Reservoir Operation

被引:19
作者
Li, J. B. [1 ]
机构
[1] Univ No British Columbia, Environm Engn Program, Prince George, BC V2N 4Z9, Canada
关键词
Chance-constrained modeling; factorial design; operation; optimization; reservoir; stochastic; uncertainty;
D O I
10.3808/jei.200300009
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
In this study, the reservoir operating rules for satisfying reliable water releases under uncertain inflows and water demands were developed. This development was based on a chance-constrained programming model associated with a factorial design measure for examining interactions among various impact factors. The reservoir inflows and water demands in different operating seasons were of normal distribution with known means and variances. The minimum cost of water releases from the reservoir was achieved by keeping minimum storage, maintaining sufficient flood and drought control capacities, achieving water demands of users, and satisfying releases to downstream channel with acceptable reliabilities. The complex interrelationships among water releases, initial reservoir storage, and reliability level were revealed through the developed model. This proposed approach would offer an improved measure for reservoir operation and management under uncertainty.
引用
收藏
页码:12 / 17
页数:6
相关论文
共 50 条
[41]   Optimal operation of a multibasin reservoir system [J].
Kumar, VV ;
Rao, BV ;
Mujumdar, PP .
SADHANA-ACADEMY PROCEEDINGS IN ENGINEERING SCIENCES, 1996, 21 :487-502
[42]   Effect of Inflow Class Selection on Multi-Objective Reservoir Operation Using Stochastic Dynamic Programming [J].
H. H. Jaafar ;
F. Al-Awar ;
F. Ahmad .
Arabian Journal for Science and Engineering, 2016, 41 :4911-4926
[43]   DEVELOPMENT OF A FUZZY-MARKOV-BASED INTERVAL STOCHASTIC DYNAMIC PROGRAMMING MODEL FOR RESERVOIR OPERATION MANAGEMENT [J].
Fu, Dianzheng ;
Li, Yongping ;
Huang, Guohe ;
Zhu, Ying .
ENVIRONMENTAL ENGINEERING AND MANAGEMENT JOURNAL, 2014, 13 (03) :517-530
[44]   Basin/Reservoir System Integration for Real Time Reservoir Operation [J].
Uysal, Gokcen ;
Sensoy, Aynur ;
Sorman, A. Arda ;
Akgun, Turker ;
Gezgin, Tolga .
WATER RESOURCES MANAGEMENT, 2016, 30 (05) :1653-1668
[45]   An efficient scenario-based stochastic programming framework for multi-objective optimal micro-grid operation [J].
Niknam, Taher ;
Azizipanah-Abarghooee, Rasoul ;
Narimani, Mohammad Rasoul .
APPLIED ENERGY, 2012, 99 :455-470
[46]   Optimal design of a district cooling grid: structure, technology integration, and operation [J].
Al-Noaimi, Fadi ;
Khir, Reem ;
Haouari, Mohamed .
ENGINEERING OPTIMIZATION, 2019, 51 (01) :160-183
[47]   Optimal Water Allocation Under Climate Change, Based on Stochastic Dynamic Programming Model Approach in Ribb Reservoir, Amhara, Ethiopia [J].
Ayele, Workineh Tadesse ;
Tenagashaw, Dires Yigezu ;
Belew, Amanuel Zewdu ;
Andualem, Tesfa Gebrie .
WATER CONSERVATION SCIENCE AND ENGINEERING, 2022, 7 (01) :33-44
[48]   Reservoir operation management by optimization and stochastic simulation [J].
Goodarzi, Ehsan ;
Ziaei, Mina ;
Shokri, Naser .
JOURNAL OF WATER SUPPLY RESEARCH AND TECHNOLOGY-AQUA, 2013, 62 (03) :138-154
[49]   Comparison of Optimal Hedging Policies for Hydropower Reservoir System Operation [J].
Tayebiyan, Aida ;
Mohammad, Thamer Ahmad ;
Al-Ansari, Nadhir ;
Malakootian, Mohammad .
WATER, 2019, 11 (01)
[50]   Integration of Optimal Time-of-Use Pricing in Stochastic Programming for Energy and Reserve Management in Smart Micro-grids [J].
Nikzad, Mehdi ;
Samimi, Abouzar .
IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY-TRANSACTIONS OF ELECTRICAL ENGINEERING, 2020, 44 (04) :1449-1466