Stochastic short-term maintenance scheduling of GENCOs in an oligopolistic electricity market

被引:24
|
作者
Ghazvini, Mohammad Ali Fotouhi [1 ]
Canizes, Bruno [1 ]
Vale, Zita [1 ]
Morais, Hugo [1 ]
机构
[1] Polytech Porto IPP, GECAD, Knowledge Engn & Decis Support Res Ctr, P-4200072 Oporto, Portugal
关键词
Cournot model; Game theory; Maintenance scheduling; Nash equilibrium; Oligopolistic market; Stochastic mixed integer programming; DEMAND RESPONSE; POWER; ENERGY; COORDINATION; WIND;
D O I
10.1016/j.apenergy.2012.07.009
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
In the proposed model, the independent system operator (ISO) provides the opportunity for maintenance outage rescheduling of generating units before each short-term (ST) time interval. Long-term (LT) scheduling for 1 or 2 years in advance is essential for the ISO and the generation companies (GENCOs) to decide their LT strategies; however, it is not possible to be exactly followed and requires slight adjustments. The Cournot-Nash equilibrium is used to characterize the decision-making procedure of an individual GENCO for ST intervals considering the effective coordination with IT plans. Random inputs, such as parameters of the demand function of loads, hourly demand during the following ST time interval and the expected generation pattern of the rivals, are included as scenarios in the stochastic mixed integer program defined to model the payoff-maximizing objective of a GENCO. Scenario reduction algorithms are used to deal with the computational burden. Two reliability test systems were chosen to illustrate the effectiveness of the proposed model for the ST decision-making process for future planned outages from the point of view of a GENCO. (C) 2012 Elsevier Ltd. All rights reserved.
引用
收藏
页码:667 / 677
页数:11
相关论文
共 50 条
  • [21] Study on Generation and Transmission Maintenance Scheduling Under Electricity Market
    Zhang Shuangmei
    Ge Ju
    2010 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2010,
  • [22] Short-Term Self-Scheduling of Virtual Energy Hub Plant Within Thermal Energy Market
    Jadidbonab, Mohammad
    Mohammadi-Ivatloo, Behnam
    Marzband, Mousa
    Siano, Pierluigi
    IEEE TRANSACTIONS ON INDUSTRIAL ELECTRONICS, 2021, 68 (04) : 3124 - 3136
  • [23] Stochastic Interchange Scheduling in the Real-Time Electricity Market
    Ji, Yuting
    Zheng, Tongxin
    Tong, Lang
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2017, 32 (03) : 2017 - 2027
  • [24] State-of-the-art short-term electricity market operation with solar generation: A review
    Yin, S.
    Wang, J.
    Li, Z.
    Fang, X.
    RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2021, 138
  • [25] Short-Term Line Maintenance Scheduling of Distribution Network With PV Penetration Considering Uncertainties
    Bao, Zhejing
    Gui, Canzhi
    Guo, Xiaogang
    IEEE ACCESS, 2018, 6 : 33621 - 33630
  • [26] Quantifying electricity storage arbitrage opportunities in short-term electricity markets in the CWE region
    Brijs, Tom
    Geth, Frederik
    De Jonghe, Cedric
    Belmans, Ronnie
    JOURNAL OF ENERGY STORAGE, 2019, 25
  • [27] Joint stochastic short-term production scheduling and fleet management optimization for mining complexes
    Christian Both
    Roussos Dimitrakopoulos
    Optimization and Engineering, 2020, 21 : 1717 - 1743
  • [28] The stochastic short-term hydropower generation scheduling considering uncertainty in load output forecasts
    Yang, Zhe
    Wang, Yufeng
    Yang, Kan
    ENERGY, 2022, 241
  • [29] Short-Term Scheduling of a Renewable-Based Microgrid: Stochastic/Economic Battery Modeling
    Pourbehzadi, Motahareh
    Niknam, Taher
    Aghaei, Jamshid
    Kavousi-Fard, Abdollah
    Dehghan, Ali
    Javidi, Giti
    Sheybani, Ehsan
    IEEE ACCESS, 2021, 9 : 90084 - 90101
  • [30] Joint stochastic short-term production scheduling and fleet management optimization for mining complexes
    Both, Christian
    Dimitrakopoulos, Roussos
    OPTIMIZATION AND ENGINEERING, 2020, 21 (04) : 1717 - 1743