摘要
The recent manufacturing environment is characterized as having diverse products due to mass customization, short production lead-time, and ever-changing customer demand. Today, the need for flexibility, quick responsiveness, and robustness to system uncertainties in production scheduling decisions has dramatically increased. In traditional job shops, tooling is usually assumed as a fixed resource. However, when a tooling resource is shared among different machines, a greater product variety, routing flexibility with a smaller tool inventory can be realized. Such a strategy is usually enabled by an automatic tool changing mechanism and tool delivery system to reduce the time for tooling set-up, hence it allows parts to be processed in small batches. In this paper, a dynamic scheduling problem under flexible tooling resource constraints is studied and presented. An integrated approach is proposed to allow two levels of hierarchical, dynamic decision making for job scheduling and tool flow control in flexible job shops. It decomposes the overall problem into a series of static sub-problems for each scheduling horizon, handles random disruptions by updating job ready time, completion time, and machine status on a rolling horizon basis, and considers the machine availability explicitly in generating schedules. The effectiveness of the proposed dynamic scheduling approach is tested in simulation studies under a flexible job shop environment, where parts have alternative routings. The study results show that the proposed scheduling approach significantly outperforms other dispatching heuristics, including cost over time (COVERT), apparent tardiness cost (ATC), and bottleneck dynamics (BD), on due-date related performance measures. It is also found that the performance difference between the proposed scheduling approach and other heuristics tend to become more significant when the number of machines is increased. The more operation steps a system has, the better the proposed method performs, relative to the other heuristics.
引用
收藏
页码:4035 / 4059
页数:25
相关论文
共 50 条
  • [1] Dynamic scheduling of flexible job shops
    School of Mechanical and Vehicular Engineering, Beijing Institute of Technology, Beijing 100081, China
    J Beijing Inst Technol Engl Ed, 2007, 1 (18-22): : 18 - 22
  • [2] Digital Twin-Driven Adaptive Scheduling for Flexible Job Shops
    Liu, Lilan
    Guo, Kai
    Gao, Zenggui
    Li, Jiaying
    Sun, Jiachen
    SUSTAINABILITY, 2022, 14 (09)
  • [3] Dynamic Scheduling of Flexible Job Shops
    SHAHID Ikramullah Butt
    孙厚芳
    JournalofBeijingInstituteofTechnology, 2007, (01) : 18 - 22
  • [4] Group scheduling in flexible flow shops
    Logendran, R
    Carson, S
    Hanson, E
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2005, 96 (02) : 143 - 155
  • [5] Performance comparison of some classes of flexible flow shops and job shops
    Lee, CY
    Vairaktarakis, GL
    INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS, 1998, 10 (04): : 379 - 405
  • [6] Performance Comparison of Some Classes of Flexible Flow Shops and Job Shops
    Chung-Yee Lee
    George L. Vairaktarakis
    International Journal of Flexible Manufacturing Systems, 1998, 10 : 379 - 405
  • [7] SCHEDULING FLEXIBLE FLOW SHOPS WITH NO SETUP EFFECTS
    CHANG, SC
    LIAO, DY
    IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 1994, 10 (02): : 112 - 122
  • [8] Integration of process planning and scheduling for distributed flexible job shops
    Lin, Chi-Shiuan
    Li, Pei-Yi
    Wei, Jun-Min
    Wu, Muh-Cherng
    COMPUTERS & OPERATIONS RESEARCH, 2020, 124
  • [9] An Agent-Based Scheduling Method for Flexible Job Shops
    Ren, Haiying
    Sun, Hongling
    INFORMATION SYSTEMS IN THE CHANGING ERA: THEORY AND PRACTICE, 2009, : 478 - 484
  • [10] Integrated Scheduling of Multiple AGVs and Machines in Flexible Job Shops
    He C.
    Song Y.
    Lei Q.
    Lyu X.
    Liu R.
    Chen J.
    Zhongguo Jixie Gongcheng/China Mechanical Engineering, 2019, 30 (04): : 438 - 447