Evaluation and selection of construction projects based on risk analysis

被引:17
作者
Issa, Usama H. [1 ,2 ]
Mosaad, Salah A. A. [3 ,4 ]
Hassan, M. Salah [4 ]
机构
[1] Taif Univ, Coll Engn, Dept Civil Engn, At Taif, Saudi Arabia
[2] Minia Univ, Fac Engn, Dept Civil Engn, Al Minya, Egypt
[3] Jabal Omar Dev Co, Project Management Div, Mecca, Saudi Arabia
[4] Minia Univ, Fac Engn, Dept Mech Power & Energy, Al Minya, Egypt
关键词
Risk analysis; Decisions; Contractor; AHP; Construction projects; HVAC; Fuzzy; DECISION-MAKING; MODEL; DELIVERY; SYSTEMS; AHP;
D O I
10.1016/j.istruc.2020.05.049
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The project selection problem has attracted significant attention among construction project participants. Typically, a contractor can execute one or more projects from available projects. This study introduces a new strategy to help contractors in evaluating and selecting suitable construction projects. The new strategy is based on identifying multiple criteria that affect construction projects as well as developing and using a model that supports decision based on the analytic hierarchy process. Furthermore, a fuzzy risk analysis model is proposed to analyze and quantify some of the identified criteria to help contractors select minimally risky projects. Market conditions, financial resources, project conditions, time delays, and cost overruns are five identified criteria that control the selection. Through identifying 70 subsidiary factors, the effects and importance of the first three criteria were determined through a field survey, while time delay and cost overrun criteria were analyzed and quantified through the risk analysis model. The new strategy was applied on a real case study comprising two HVAC system projects in the construction industry (project 1 in Egypt and project 2 in Saudi Arabia). Criteria and causes that yield different effects on the new strategy to support contractor decision and selection control are discussed in detail. Risk factors were ranked according to their importance, and their effects on both time and cost were clarified. The results obtained from the investigated case study showed 55.5% support for project 2, and only 44.5% support for project 1. This strategy is applicable to other case studies in different countries with different projects, criteria, and execution activities.
引用
收藏
页码:361 / 370
页数:10
相关论文
共 45 条
[21]  
Issa UH, 2012, J Civil Eng Architect, V6, P504, DOI [10.17265/1934-7359/2012.03.010, DOI 10.17265/1934-7359/2012.03.010]
[22]   A DECISION SUPPORT MODEL FOR CIVIL ENGINEERING PROJECTS BASED ON MULTI-CRITERIA AND VARIOUS DATA [J].
Issa, Usama H. ;
Miky, Yehia H. ;
Abdel-Malak, Fam F. .
JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2019, 25 (02) :100-113
[23]   Selection and use of Alternative Dispute Resolution (ADR) in construction projects - Past and future research [J].
Lee, Chia Kuang ;
Yiu, Tak Wing ;
Cheung, Sai On .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2016, 34 (03) :494-507
[24]   USING FUZZY ANALYTIC NETWORK PROCESS AND ISM METHODS FOR RISK ASSESSMENT OF PUBLIC-PRIVATE PARTNERSHIP: A CHINA PERSPECTIVE [J].
Li, Yan ;
Wang, Xinyu .
JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2019, 25 (02) :168-183
[25]   Bidding Strategy to Support Decision-Making Based on Comprehensive Information in Construction Projects [J].
Liang, Ru ;
Sheng, Zhaohan ;
Xu, Feng ;
Wu, Changzhi .
DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2016, 2016
[26]  
Mohemad R, 2018, INT J CIV ENG TECHNO, V9, P1871
[27]  
Mohemad R., 2010, INT J COMPUT SCI ISS, V7
[28]   Risks affecting the delivery of HVAC systems: Identifying and analysis [J].
Mosaad, S. A. A. ;
Issa, U. H. ;
Hassan, M. Salah .
JOURNAL OF BUILDING ENGINEERING, 2018, 16 :20-30
[29]  
Mousavi SM, 2013, APPL MATH MODEL, V37, P2241, DOI [10.1016/j.apm.2012.05.019, 10.1016/j.apm.2011.11.050]
[30]   Risk assessment in non-standard forms of civil engineering consulting services [J].
Piyadasa, W. M. Sarath C. ;
Hadikusumo, Bonaventura H. W. .
JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2014, 20 (05) :746-759