Evaluation and selection of construction projects based on risk analysis

被引:17
作者
Issa, Usama H. [1 ,2 ]
Mosaad, Salah A. A. [3 ,4 ]
Hassan, M. Salah [4 ]
机构
[1] Taif Univ, Coll Engn, Dept Civil Engn, At Taif, Saudi Arabia
[2] Minia Univ, Fac Engn, Dept Civil Engn, Al Minya, Egypt
[3] Jabal Omar Dev Co, Project Management Div, Mecca, Saudi Arabia
[4] Minia Univ, Fac Engn, Dept Mech Power & Energy, Al Minya, Egypt
关键词
Risk analysis; Decisions; Contractor; AHP; Construction projects; HVAC; Fuzzy; DECISION-MAKING; MODEL; DELIVERY; SYSTEMS; AHP;
D O I
10.1016/j.istruc.2020.05.049
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The project selection problem has attracted significant attention among construction project participants. Typically, a contractor can execute one or more projects from available projects. This study introduces a new strategy to help contractors in evaluating and selecting suitable construction projects. The new strategy is based on identifying multiple criteria that affect construction projects as well as developing and using a model that supports decision based on the analytic hierarchy process. Furthermore, a fuzzy risk analysis model is proposed to analyze and quantify some of the identified criteria to help contractors select minimally risky projects. Market conditions, financial resources, project conditions, time delays, and cost overruns are five identified criteria that control the selection. Through identifying 70 subsidiary factors, the effects and importance of the first three criteria were determined through a field survey, while time delay and cost overrun criteria were analyzed and quantified through the risk analysis model. The new strategy was applied on a real case study comprising two HVAC system projects in the construction industry (project 1 in Egypt and project 2 in Saudi Arabia). Criteria and causes that yield different effects on the new strategy to support contractor decision and selection control are discussed in detail. Risk factors were ranked according to their importance, and their effects on both time and cost were clarified. The results obtained from the investigated case study showed 55.5% support for project 2, and only 44.5% support for project 1. This strategy is applicable to other case studies in different countries with different projects, criteria, and execution activities.
引用
收藏
页码:361 / 370
页数:10
相关论文
共 45 条
  • [1] Abdel-malak F.F., 2017, BENI-SUEF U J BASIC, V6, P326, DOI DOI 10.1016/J.BJBAS.2017.05.004
  • [2] Causes of delay in Saudi public construction projects
    Alsuliman, Jawad A.
    [J]. ALEXANDRIA ENGINEERING JOURNAL, 2019, 58 (02) : 801 - 808
  • [3] Identification of sustainable criteria for decision-making on roof stacking construction method
    Amer, Mohamed
    Attia, Shady
    [J]. SUSTAINABLE CITIES AND SOCIETY, 2019, 47
  • [4] Bagies A., 2006, 22nd Annual ARCOM Conference, Birmingham, UK, Association of researchers in construction Management, P511
  • [5] A workflow model for systems and interior finishing works in building construction
    Brodetskaia, Irina
    Sacks, Rafael
    Shapira, Aviad
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2011, 29 (12) : 1209 - 1227
  • [6] INTERNAL AND EXTERNAL RISK BASED ASSESMENT AND EVALUATION FOR THE LARGE INFRASTRUCTURE PROJECTS
    Burcar Dunovic, Ivana
    Radujkovic, Mladen
    Vukomanovic, Mladen
    [J]. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2016, 22 (05) : 673 - 682
  • [7] Project delivery system selection of construction projects in China
    Chen, Yong Qiang
    Liu, Jun Ying
    Li, Bingguang
    Lin, Binshan
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (05) : 5456 - 5462
  • [8] EXPLORING THE PROPERTIES OF COST OVERRUN RISK PROPAGATION NETWORK (CORPN) FOR PROMOTING COST MANAGEMENT
    Chen, Yun
    Hu, Zhigen
    Liu, Quan
    [J]. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2019, 25 (01) : 1 - 18
  • [9] Accident risk identification and its impact analyses for strategic construction safety management
    Chi, Seokho
    Han, Sangwon
    Kim, Dae Young
    Shin, Yoonjung
    [J]. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2015, 21 (04) : 524 - 538
  • [10] Identification of construction subcontractor prequalification evaluation criteria and their impact on project success
    El-khalek, Hesham A.
    Aziz, Remon F.
    Morgan, Enas S.
    [J]. ALEXANDRIA ENGINEERING JOURNAL, 2019, 58 (01) : 217 - 223