Analysis of two left-turn equations from the Highway Capacity Manual

被引:0
作者
Hurdle, VF [1 ]
Lord, D [1 ]
机构
[1] Univ Toronto, Dept Civil Engn, Toronto, ON M5S 1A4, Canada
来源
HIGHWAY CAPACITY ISSUES 1998 | 1998年 / 1646期
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The left-rum procedures in the Highway Capacity Manual are complex, and some of the equations are presented with little explanation of how they were obtained and the assumptions they embody. This paper is an analytic exploration of two of the four equations used to estimate g(q), the amount of green time needed to discharge the opposing queue, and g(f), the amount of green time available for through vehicles before the first left-turning vehicle enters the intersection. The investigation reveals surprising hidden assumptions underlying Equation 9-17 for g(q), which lead to errors when the opposing flow includes left turns. In the case of Equation 9-20 for g(f), the theoretical results are consistently about 5 s larger but otherwise in reasonable agreement with the empirical equation and provide insight into how it could be improved. An analytic approximation is offered either as a replacement or as a framework for an improved empirical model.
引用
收藏
页码:71 / 78
页数:8
相关论文
共 8 条
  • [1] AKCELIK R, 1989, ITE J, V59, P21
  • [2] Akcelik R., 1988, P 14 ARRB C, V14, P228
  • [3] [Anonymous], INTRO PROBABILITY TH
  • [4] [Anonymous], 1985, 209 TRB NAT RES COUN
  • [5] [Anonymous], 1994, 209 TRB NAT RES COUN
  • [6] PRASSAS EP, 1991, TRANSPORTATION RES R, V1398, P75
  • [7] Roess R. P., 1990, TRANSPORT RES REC, V1287, P138
  • [8] Ross SM., 2004, INTRO PROBABILITY ST