Agent Risk Evaluation In Agent-Construction System Based On Analytic Hierarchy Process

被引:0
|
作者
Chen, Jingru [1 ]
Zheng, Shaoying [1 ]
Yang, Shujuan [1 ]
Liang, Zhenhui [1 ]
机构
[1] Qingdao Technol Univ, Sch Civil Engn, Oingdao, Peoples R China
来源
2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31 | 2008年
关键词
agent-construction system; agent; risk analysis; risk evaluation; Analytic Hierarchy Process;
D O I
暂无
中图分类号
TN [电子技术、通信技术];
学科分类号
0809 ;
摘要
As one of the significant reform methods to improve the management level of government investment project, agent-construction system has been applied In many places. During the process of agent construction, agent assumes considerable risk. This paper identifies the main risks of agent. Based on the Analytic Hierarchy Process method, the main risk and relative influence factors are analyzed and evaluated. The Importance degree order of main risks and relative influence factors are put forward. The research of this paper can be referred by risk management engineers In agent-construction projects.
引用
收藏
页码:10720 / 10723
页数:4
相关论文
共 50 条