Risk-constrained optimal scheduling with combining heat and power for concentrating solar power plants

被引:12
作者
Fang, Yuchen [1 ]
Zhao, Shuqiang [1 ]
机构
[1] North China Elect Power Univ, State Key Lab Alternate Elect Power Syst Renewabl, Beijing 102206, Peoples R China
关键词
Concentrating solar power; District heating; Combined heat and power; Optimal scheduling; Information gap decision theory; INTEGRATION; ENERGY; DISPATCH;
D O I
10.1016/j.solener.2020.08.043
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Concentrating Solar Power (CSP), a schedulable renewable energy technology, realizes the conversion of "solar-heat-electric". The benefits from the thermal energy storage (TES) and its potential for heating need to be explored. In desert areas with low population density and relatively concentrated industrial loads, a CSP plant equipped with back-pressure turbines (BT) as generators can use waste heat from power generation to supply heat, which effectively improves the energy production efficiency of CSP plants. Thus, a combined heat and power scheduling model for CSP plants to participate in heating is established in this paper. In order to cope with the uncertain parameters of the model, the information gap decision theory (IGDT) is introduced to describe them. IGDT can draw on the risk-seeker strategy and risk-averse strategy to deal with the uncertainty, and thus provide a reasonable decision basis for the scheduling operation. In addition, we ensure that the storage cycling of CSP plants is energy neutral, which could allow the plant to optimize its output for multiple consecutive days to meet demands. Finally, the model is verified to ensure that the predefined profit level could be achieved and the corresponding scheduling strategy under different operational risk is obtained.
引用
收藏
页码:937 / 948
页数:12
相关论文
共 32 条
[1]   District Heating Safety Issues: Interactions Between Grounding Systems and Thermal Installations [J].
Abdin, Giulio Cerino ;
Freschi, Fabio ;
Mitolo, Massimo ;
Poggio, Alberto ;
Tartaglia, Michele .
IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS, 2016, 52 (03) :2040-2045
[2]  
Ben-Haim Y., 2006, Academic, DOI DOI 10.1016/B978-0-12-373552-2.X5000-0
[3]   Critical role of interface contact modulation in realizing low -temperature fabrication of efficient and stable CsPbIBr 2 perovskite solar cells [J].
Cao, Siliang ;
Wang, Huaxin ;
Li, Haiyun ;
Chen, Jiangzhao ;
Zang, Zhigang .
CHEMICAL ENGINEERING JOURNAL, 2020, 394
[4]   Optimal integration of solar energy in a district heating network [J].
Carpaneto, E. ;
Lazzeroni, P. ;
Repetto, M. .
RENEWABLE ENERGY, 2015, 75 :714-721
[5]  
Chen Haiping, 2014, Proceedings of the CSEE, V34, P2251
[6]   Reducing Generation Uncertainty by Integrating CSP With Wind Power: An Adaptive Robust Optimization-Based Analysis [J].
Chen, Runze ;
Sun, Hongbin ;
Guo, Qinglai ;
Li, Zhigang ;
Deng, Tianhu ;
Wu, Wenchuan ;
Zhang, Boming .
IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, 2015, 6 (02) :583-594
[7]   Self-scheduling of a hydro producer in a pool-based electricity market [J].
Conejo, AJ ;
Arroyo, JM ;
Contreras, J ;
Villamor, FA .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2002, 17 (04) :1265-1272
[8]  
Dallmer-Zerbe K, 2013, 2013 IEEE GRENOBLE POWERTECH (POWERTECH)
[9]   Look-ahead bidding strategy for concentrating solar power plants with wind farms [J].
Fang, Yuchen ;
Zhao, Shuqiang .
ENERGY, 2020, 203
[10]  
Furbo S., 1983, International Journal of Solar Energy, V1, P419, DOI 10.1080/01425918208909903