Technological and geomechanical parameters of room-and-pillar system of mining a thick flat seam

被引:4
|
作者
Egorov, PV [1 ]
Kalinin, SI
Agudalin, BP
机构
[1] Kuzbass State Tech Univ, Kemerovo, Russia
[2] State Sci Res Inst Geomech & Surveying, Siberian Branch, Interbranch Sci Ctr, VNIMI, Prokopyevsk, Russia
[3] Uglekop Mine, Joint Stock Co, Mezhdurechensk, Russia
关键词
room; pillar; block; displacement; rate; area; rock pressure;
D O I
10.1023/A:1015166906969
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
The results of experimental investigations are considered for mining a thick scam with a hard-to-cave roof by room-and-pillar system; the quantitative values of its parameters and criterion for the step of main roof caving with respect to outcropping area are established. Technological parameters and control of rock pressure manifestation are substantiated.
引用
收藏
页码:472 / 474
页数:3
相关论文
共 50 条
  • [1] Technological and Geomechanical Parameters of Room-and-Pillar System of Mining a Thick Flat Seam
    P. V. Egorov
    S. I. Kalinin
    B. P. Agudalin
    Journal of Mining Science, 2001, 37 : 472 - 474
  • [2] Roadway layout for recycling residual coal pillar in room-and-pillar mining of thick coal seam
    Jin Gan
    Wang Lianguo
    Zhang Jihua
    Hu Minjun
    Duan Ning
    InternationalJournalofMiningScienceandTechnology, 2015, 25 (05) : 729 - 734
  • [3] Roadway layout for recycling residual coal pillar in room-and-pillar mining of thick coal seam
    Jin Gan
    Wang Lianguo
    Zhang Jihua
    Hu Minjun
    Duan Ning
    INTERNATIONAL JOURNAL OF MINING SCIENCE AND TECHNOLOGY, 2015, 25 (05) : 729 - 734
  • [4] GEOMECHANICAL JUSTIFICATION OF DESIGN PARAMETERS OF ROOM-AND-PILLAR MINING SYSTEM FOR DESIGNING OF DEEP-LYING HORIZONS OF SUBR
    Sidorov, D. V.
    JOURNAL OF MINING INSTITUTE, 2012, 199 : 134 - 140
  • [5] Technological and geomechanical parameters of chamber-column system of mining the seam
    Egorov, P.V.
    Kalinin, S.I.
    Agudalin, B.P.
    Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, 2001, (05): : 30 - 32
  • [6] Geomechanical safety aspects in hard rocks mining based on room-and-pillar and longwall mining systems
    Pytel, Witold
    Palac-Walko, Bogumila
    Mertuszka, Piotr
    MINEFILL 2020-2021, 2021, : 288 - 304
  • [7] Automation Advances With Room-and-Pillar Mining
    Fiscor, Steve
    Coal Age, 2023, 128 (04): : 18 - 22
  • [8] Reasonable pillar size design and nugget structural parameters optimization in room-and-pillar mining
    Zhao, Guoyan
    Zhou, Li
    Li, Jinyue
    Yu, Peipei
    Zhongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Central South University (Science and Technology), 2014, 45 (11): : 3943 - 3948
  • [9] Pillar drawing in room-and-pillar mining at Jinshan Gold Mine
    Yu, Rong-Bing
    Wan, Guo-Chun
    2003, Mining Research and Development (23):
  • [10] ROOM-AND-PILLAR MINING AT DEVCOS PRINCE MINE
    MACLEAN, AR
    MERNER, DR
    CIM BULLETIN, 1978, 71 (794): : 59 - 62