Application ob mathematical matrix to integrate project schedule and cost

被引:13
作者
Lee, HS [1 ]
Yi, KJ [1 ]
机构
[1] Seoul Natl Univ, Dept Architecture, Seoul 151742, South Korea
来源
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE | 1999年 / 125卷 / 05期
关键词
D O I
10.1061/(ASCE)0733-9364(1999)125:5(339)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This research is a numerical approach to the integration of the time and cost data sets for construction projects, which addresses the conflicts between them. Mathematical matrices are introduced to show the interrelationships between the time and cost data sets and their effect on each other, and to solve the conflict due to the differences between work breakdown structure and cost breakdown structure. Several matrices of time and cost data sets of construction projects are defined. The interrelationships among the matrices are investigated and several time- and cost-related matrix equations are presented. Based on the equations, this research develops a project planning and control algorithm that estimates the expected project cost and duration and evaluates the project economy using the matrix equations derived here. The matrix application is implemented through a spreadsheet program in which the matrices are automatically connected with each other. A case study involving a housing project is performed to verify the capability and utility of this computerized matrix application in integrating project time and cost.
引用
收藏
页码:339 / 346
页数:8
相关论文
共 7 条
[1]  
Harris R.B., 1978, PRECEDENCE ARROW NET
[2]  
Hendrickson C., 1989, Project management for construction: Fundamental concepts for owners, engineers, architects, and builders
[3]  
KIM JJ, 1995, J ARCH I KOREA, V11, P163
[4]   New approach for optimization of overall construction schedule [J].
Li, SR .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1996, 122 (01) :7-13
[5]  
Moder J.J., 1983, Project Management with CPM, PERT and Precedence Diagramming
[6]  
Popescu C. M., 1995, Project planning, scheduling, and control in construction: An encyclopedia of terms and applications
[7]  
TEICHOLZ PM, 1987, PROJECT CONTROLS NEE, P47