共 50 条
- [41] Correction to: A 3D time domain numerical model based on half-space Green’s function for soil–structure interaction analysis Computational Mechanics, 2019, 64 : 273 - 273
- [43] Development of a vehicle–track interaction model to predict the vibratory benefits of rail grinding in the time domain Journal of Modern Transportation, 2015, 23 (3): : 189 - 201
- [44] RAIL-STRUCTURE INTERACTION ANALYSIS OF SLIDING SLAB TRACK ON BRIDGE PROCEEDINGS OF THE ASME JOINT RAIL CONFERENCE, 2015, 2015,
- [45] TRACK-STRUCTURE INTERACTION ANALYSIS USING FE MODELLING TECHNIQUES ROAD AND RAIL INFRASTRUCTURE III, 2014, : 467 - 473
- [47] A practical procedure for time-domain soil-structure interaction analysis of structures on pile foundations EARTHQUAKE GEOTECHNICAL ENGINEERING FOR PROTECTION AND DEVELOPMENT OF ENVIRONMENT AND CONSTRUCTIONS, 2019, 4 : 1612 - 1620
- [49] EFFECTIVE TIME-DOMAIN SOIL STRUCTURE INTERACTION ANALYSIS BASED ON FFT ALGORITHM WITH CAUSALITY CONDITION EARTHQUAKE ENGINEERING & STRUCTURAL DYNAMICS, 1990, 19 (05): : 693 - 708
- [50] AN EFFICIENT TIME-DOMAIN SOIL STRUCTURE INTERACTION ANALYSIS BASED ON THE DYNAMIC STIFFNESS OF AN UNBOUNDED SOIL EARTHQUAKE ENGINEERING & STRUCTURAL DYNAMICS, 1992, 21 (09): : 787 - 798