共 22 条
- [1] [Anonymous], J SCI TECHNOLOGY SEC
- [2] Chang H. K., 2017, P 34 INT S AUT ROB C, DOI [10.22260/ISARC2017/0072, DOI 10.22260/ISARC2017/0072]
- [5] Kaur R., 2013, INT J COMPUTER SCI E, V4, P877
- [6] Khodakarami V., 2007, PROJ MANAG J, V38, P39, DOI [https://doi.org/10.1177/875697280703800205, DOI 10.1177/875697280703800205]
- [7] A Probabilistic Software Risk Assessment and Estimation Model for Software Projects [J]. ELEVENTH INTERNATIONAL CONFERENCE ON COMMUNICATION NETWORKS, ICCN 2015/INDIA ELEVENTH INTERNATIONAL CONFERENCE ON DATA MINING AND WAREHOUSING, ICDMW 2015/NDIA ELEVENTH INTERNATIONAL CONFERENCE ON IMAGE AND SIGNAL PROCESSING, ICISP 2015, 2015, 54 : 353 - 361
- [8] Liberatore M.J., 2005, PROJ MANAG J, V36, P15
- [9] Schedule Uncertainty Control: A Literature review [J]. 2012 INTERNATIONAL CONFERENCE ON MEDICAL PHYSICS AND BIOMEDICAL ENGINEERING (ICMPBE2012), 2012, 33 : 1842 - 1848