Multi-objective optimization of feed-water heater arrangement options in a steam power plant repowering

被引:27
作者
Naserabad, S. Nikbakht [1 ]
Mehrpanahi, A. [2 ]
Ahmadi, G. [3 ]
机构
[1] Semnan Univ, Dept Mech Engn, Semnan, Iran
[2] Shahid Rajaee Teacher Training Univ, Dept Mech Engn, Tehran, Iran
[3] Islamic Azad Univ, Khomeinishahr Branch, Dept Mech Engn, Esfahan, Iran
关键词
Repowering; Optimization; Efficiency improvement; Sustainable development; HRSG; Heat recovery; COMBINED-CYCLE; THERMOECONOMIC OPTIMIZATION; CHP SYSTEM; HEAVY-DUTY; PERFORMANCE; GENERATOR; ENERGY; MW;
D O I
10.1016/j.jclepro.2019.02.125
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
In this paper, the full repowering of a steam Power Plant with a capacity of 320 MW in Iran was evaluated technically and economically. Implementation of this plan for the target power plant was selected because of its over 30 years of age. Due to the presence of steam flash feed water preheaters and the possibility of preheating feed water entirely or partially prior to entering heat recovery steam generator, the effect of using or not using these low and high pressure equipment was evaluated in different cases. To do this, five different cases were proposed and reviewed. Considering the available gas turbines in Iran, the gas turbines models Siemens V94.2 and V94.3A were selected. In each case, the optimum point is obtained in terms of the lowest cost of electricity generation. Finally, after reviewing the results of all cases, full repowering plan with parallel feed water heating was selected as the best alternative in terms of energy and exergy efficiencies and the price of generating electricity. If two heat recovery steam generators and two V94.3A gas turbines are used, the net exergy and energy efficiencies for the cycle can reach 54.49% and 52.98%, respectively. Moreover, the power capacity of a repowered unit is equal to 700.44 MW with electricity generation price of 0.05986 $/kWh. (C) 2019 Elsevier Ltd. All rights reserved.
引用
收藏
页码:253 / 270
页数:18
相关论文
共 43 条
[1]  
Abbas Bandar, 2000, STEAM POWER PLANT DA
[2]   Technical and environmental analysis of repowering the existing CHP system in a petrochemical plant: A case study [J].
Ahmadi, Gholamreza ;
Toghraie, Davood ;
Akbari, Omid Ali .
ENERGY, 2018, 159 :937-949
[3]   Thermodynamic analysis and thermoeconomic optimization of a dual pressure combined cycle power plant with a supplementary firing unit [J].
Ahmadi, Pouria ;
Dincer, Ibrahim .
ENERGY CONVERSION AND MANAGEMENT, 2011, 52 (05) :2296-2308
[4]   Exergoenvironmental analysis and optimization of a cogeneration plant system using Multimodal Genetic Algorithm (MGA) [J].
Ahmadi, Pouria ;
Dincer, Ibrahim .
ENERGY, 2010, 35 (12) :5161-5172
[5]   Exergetic performance evaluation of a combined heat and power (CHP) system in Turkey [J].
Balli, Ozgur ;
Aras, Haydar ;
Hepbasli, Arif .
INTERNATIONAL JOURNAL OF ENERGY RESEARCH, 2007, 31 (09) :849-866
[6]  
Bejan A., 1995, Thermal Design and Optimization
[7]   Repowering existing under-utilized WTE power plant with gas turbines [J].
Bianchi, Michele ;
Branchini, Lisa ;
Cesari, Simone ;
De Pascale, Andrea ;
Melino, Francesco .
APPLIED ENERGY, 2015, 160 :902-911
[8]   Combining waste-to-energy steam cycle with gas turbine units [J].
Bianchi, Michele ;
Branchini, Lisa ;
De Pascale, Andrea .
APPLIED ENERGY, 2014, 130 :764-773
[9]   Exergetic optimization of single level combined gas-steam power plants considering different objective functions [J].
Bracco, Stefano ;
Siri, Silvia .
ENERGY, 2010, 35 (12) :5365-5373
[10]   REPOWERING APPLICATION CONSIDERATIONS [J].
BRANDER, JA ;
CHASE, DL .
JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER-TRANSACTIONS OF THE ASME, 1992, 114 (04) :643-652