1976 Montreal Olympics: Case Study of Project Management Failure

被引:6
|
作者
Patel, Ashish [1 ,2 ]
Bosela, Paul A. [2 ]
Delatte, Norbert J. [2 ]
机构
[1] HWH Architects Engineers Planners Inc, Cleveland, OH 44114 USA
[2] Cleveland State Univ, Dept Civil & Environm Engn, Cleveland, OH 44115 USA
基金
美国国家科学基金会;
关键词
Project management; Construction; Precast concrete; Project scheduling;
D O I
10.1061/(ASCE)CF.1943-5509.0000332
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A successful engineering project must include its timely and economic completion. Aproject management failure can lead to delays and cost overruns. One example of a project that greatly exceeded its projected budget is the construction of the multiple facilities for the 1976 Olympic Games in Montreal. These included the Olympic Stadium, a velodrome for bicycle events, and the Olympic Village to house the athletes. This case study reviews the circumstances of the cost increases and the design decisions and other circumstances that led to them. The difficulties were brought on by an unrealistic schedule to complete the facilities before the fixed start date of the Games, combined with an unusually cavalier attitude toward project costs, exacerbated by political tensions. Although the original cost estimate for the facilities was $120 million, the final cost was $1.5 billion, with $830 million for the main stadium alone. Part of the justification for the expense of the facilities was the hope that the facilities would be useful for future athletic events-the record on this is mixed at best. The lessons learned can be applied to other projects to better control costs. (C) 2013 American Society of Civil Engineers.
引用
收藏
页码:362 / 369
页数:8
相关论文
共 50 条
  • [31] PROJECT-MANAGEMENT AUDIT - A CASE-STUDY
    RAMNATHAN, TK
    PROJECT MANAGEMENT FOR DEVELOPING COUNTRIES: INTERNATIONAL SEMINAR, 1991, : 307 - 314
  • [32] Value Stream Mapping in Project Management: A Case Study
    Bevilacqua, Maurizio
    Ciarapica, Filippo E.
    Giacchetta, Giancarlo
    PROJECT MANAGEMENT JOURNAL, 2008, 39 (03) : 110 - 124
  • [33] PROJECT-MANAGEMENT IN TELECOMMUNICATIONS - A CASE-STUDY
    IMAM, MH
    DHILLON, JS
    33RD ANNUAL MEETING OF THE AMERICAN ASSOCIATION OF COST ENGINEERS, 1989, : 210 - 215
  • [34] Mixing project management and distance education: a case study
    Hanlon, Don
    Spence, Michael
    Pfeiffer, Phil
    Software Engineering Education Conference, Proceedings, 2000, : 176 - 184
  • [35] Project Management System Implementation in SMEs: A Case Study
    Alves, Pedro Raposo
    Tereso, Anabela
    Fernandes, Gabriela
    EDUCATION EXCELLENCE AND INNOVATION MANAGEMENT THROUGH VISION 2020, 2019, : 8322 - 8332
  • [36] A CASE-STUDY OF HUMAN MANAGEMENT AT A CONSTRUCTION PROJECT
    RAU, AN
    PROJECT MANAGEMENT FOR DEVELOPING COUNTRIES: INTERNATIONAL SEMINAR, 1991, : 153 - 155
  • [37] Scope Role in Successful Project Management (A Case Study)
    Bashiri, Amir Reza Gholipour
    INTERNATIONAL CONFERENCE ON ADVANCED MANAGEMENT SCIENCE AND INFORMATION ENGINEERING (AMSIE 2015), 2015, : 872 - 875
  • [38] Project management: a case study of a successful ERP implementation
    Carton, Fergal
    Adam, Frederic
    Sammon, David
    INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2008, 1 (01) : 106 - 124
  • [39] Management process of the project of mobile technologies: A case study
    Castro Araya, Hazel
    REVISTA GESTION DE LA EDUCACION, 2014, 4 (01): : 103 - 137
  • [40] StartProject: Project Management Model. A Study Case
    Garcia, Ricardo
    De La Cruz, Fabian
    Guerron, Ximena
    Conrado, Geovanny
    Quiroz-Palma, Patricia
    Soto, Daysi
    2019 14TH IBERIAN CONFERENCE ON INFORMATION SYSTEMS AND TECHNOLOGIES (CISTI), 2019,