1976 Montreal Olympics: Case Study of Project Management Failure

被引:6
|
作者
Patel, Ashish [1 ,2 ]
Bosela, Paul A. [2 ]
Delatte, Norbert J. [2 ]
机构
[1] HWH Architects Engineers Planners Inc, Cleveland, OH 44114 USA
[2] Cleveland State Univ, Dept Civil & Environm Engn, Cleveland, OH 44115 USA
基金
美国国家科学基金会;
关键词
Project management; Construction; Precast concrete; Project scheduling;
D O I
10.1061/(ASCE)CF.1943-5509.0000332
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A successful engineering project must include its timely and economic completion. Aproject management failure can lead to delays and cost overruns. One example of a project that greatly exceeded its projected budget is the construction of the multiple facilities for the 1976 Olympic Games in Montreal. These included the Olympic Stadium, a velodrome for bicycle events, and the Olympic Village to house the athletes. This case study reviews the circumstances of the cost increases and the design decisions and other circumstances that led to them. The difficulties were brought on by an unrealistic schedule to complete the facilities before the fixed start date of the Games, combined with an unusually cavalier attitude toward project costs, exacerbated by political tensions. Although the original cost estimate for the facilities was $120 million, the final cost was $1.5 billion, with $830 million for the main stadium alone. Part of the justification for the expense of the facilities was the hope that the facilities would be useful for future athletic events-the record on this is mixed at best. The lessons learned can be applied to other projects to better control costs. (C) 2013 American Society of Civil Engineers.
引用
收藏
页码:362 / 369
页数:8
相关论文
共 50 条
  • [11] CASE STUDY OF PROJECT MANAGEMENT IN DISTRICT COURT
    Kuzmicz, Monika
    Orlowski, Cezary
    Bober, Bartosz
    COMPUTER SCIENCE-AGH, 2018, 19 (04): : 361 - 384
  • [12] PROJECT MANAGEMENT IN RESEARCH AND DEVELOPMENT - A CASE STUDY
    PEARSON, AW
    GEAR, AE
    BRITISH CHEMICAL ENGINEERING, 1969, 14 (11): : 1537 - &
  • [13] Case study of project management process improvement
    Kramarenko, S.
    Karaulova, T.
    Annals of DAAAM for 2006 & Proceedings of the 17th International DAAAM Symposium: INTELLIGENT MANUFACTURING & AUTOMATION: FOCUS ON MECHATRONICS AND ROBOTICS, 2006, : 209 - 210
  • [14] Knowledge management on site: a case study project
    Wilkinson, Robert
    Sherratt, Fred
    Farrell, Peter
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-MANAGEMENT PROCUREMENT AND LAW, 2015, 168 (02) : 99 - 109
  • [15] Implementing project management in a utility: A case study
    Bolz, D
    OMalley, JJ
    Overbye, D
    PROCEEDINGS OF THE AMERICAN POWER CONFERENCE, VOL 58, PTS I AND II, 1996, 58 : 1020 - 1025
  • [16] Exploratory case study research: Outsourced project failure
    Verner, J. M.
    Abdullah, L. M.
    INFORMATION AND SOFTWARE TECHNOLOGY, 2012, 54 (08) : 866 - 886
  • [17] Case study: From project failure to part validation
    1600, Society of Plastics Engineers (73):
  • [18] THE EFFECT OF A PROJECT MANAGEMENT OFFICE ON PROJECT AND ORGANISATIONAL PERFORMANCE: A CASE STUDY
    van der Linde, J.
    Steyn, H.
    SOUTH AFRICAN JOURNAL OF INDUSTRIAL ENGINEERING, 2016, 27 (01): : 151 - 161
  • [19] Improving project success: A case study using benefits and project management
    Gomes, Jorge
    Romao, Mario
    INTERNATIONAL CONFERENCE ON ENTERPRISE INFORMATION SYSTEMS/INTERNATIONAL CONFERENCE ON PROJECT MANAGEMENT/INTERNATIONAL CONFERENCE ON HEALTH AND SOCIAL CARE INFORMATION SYSTEMS AND TECHNOLOGIES, CENTERIS/PROJMAN / HCIST 2016, 2016, 100 : 489 - 497
  • [20] Pavement management with dynamic traffic and artificial neural network: a case study of Montreal
    Amin, Md. Shohel Reza
    Amador-Jimenez, Luis E.
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2016, 43 (03) : 241 - 251