THE ROLE OF ECONOMIC UNCERTAINTY ON THE BLOCK ECONOMIC VALUE - A NEW VALUATION APPROACH

被引:5
作者
Dehghani, H. [1 ]
Ataee-Pour, M. [1 ]
机构
[1] Amirkabir Univ Technol, Fac Min & Met Engn, Tehran, Iran
关键词
metal price uncertainty; operating cost uncertainty; binomial tree; block economic value; net present value; REAL OPTIONS; PRICE;
D O I
10.2478/v10267-012-0066-6
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
The block economic value (BEV) is one of the most important parameters in mine evaluation. This parameter can affect significant factors such as mining sequence, final pit limit and net present value. Nowadays, the aim of open pit mine planning is to define optimum pit limits and an optimum life of mine production scheduling that maximizes the pit value under some technical and operational constraints. Therefore, it is necessary to calculate the block economic value at the first stage of the mine planning process, correctly. Unrealistic block economic value estimation may cause the mining project managers to make the wrong decision and thus may impose inexpiable losses to the project. The effective parameters such as metal price, operating cost, grade and so forth are always assumed certain in the conventional methods of BEV calculation. While, obviously, these parameters have uncertain nature. Therefore, usually, the conventional methods results are far from reality. In order to solve this problem, a new technique is used base on an invented binomial tree which is developed in this research. This method can calculate the BEV and project NPV under economic uncertainty. In this paper, the BEV and project NPV were initially determined using Whittle formula based on certain economic parameters and a multivariate binomial tree based on the economic uncertainties such as the metal price and cost uncertainties. Finally the results were compared. It is concluded that applying the metal price and cost uncertainties causes the calculated block economic value and net present value to be more realistic than certain conditions.
引用
收藏
页码:991 / 1014
页数:24
相关论文
共 20 条
  • [1] Valuing real capital investments using the least-squares Monte Carlo method
    Abdel Sabour, Sabry A.
    Poulin, Richard
    [J]. Engineering Economist, 2006, 51 (02) : 141 - 160
  • [2] Akbari AD, 2009, ARCH MIN SCI, V54, P321
  • [3] Ataee-Pour M., 2005, The 19th International Mining Congress and Fair of Turkey, P289
  • [4] EVALUATING NATURAL-RESOURCE INVESTMENTS
    BRENNAN, MJ
    SCHWARTZ, ES
    [J]. JOURNAL OF BUSINESS, 1985, 58 (02) : 135 - 157
  • [5] OPTION PRICING - SIMPLIFIED APPROACH
    COX, JC
    ROSS, SA
    RUBINSTEIN, M
    [J]. JOURNAL OF FINANCIAL ECONOMICS, 1979, 7 (03) : 229 - 263
  • [6] Dehghani H., 2011, RESOURCES P IN PRESS
  • [7] Evaluating mine plans under uncertainty: Can the real options make a difference?
    Dimitrakopoulos, Roussos G.
    Sabour, Sabry A. Abdel
    [J]. RESOURCES POLICY, 2007, 32 (03) : 116 - 125
  • [8] Henry E., 2004, GEOSTATISTICS, P501
  • [9] Jaszczuk M, 2008, ARCH MIN SCI, V53, P183
  • [10] Kelly Simone., 1998, Quarterly Review of Economic and Finance, V38, P693, DOI DOI 10.1016/S1062-9769(99)80097-0