A Genetic Algorithm Developed for a Supply Chain Scheduling Problem

被引:6
|
作者
Taheri, Seyed Mohammad Reza [1 ]
Beheshtinia, Mohammad Ali [1 ]
机构
[1] Univ Semnan, Dept Ind Engn, Semnan, Iran
关键词
Genetic algorithm; Meta-heuristic; Supply chain; Scheduling; Logistic; OPTIMIZATION;
D O I
10.22059/IJMS.2019.254633.673069
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper concentrates on the minimization of total tardiness and earliness of orders in an integrated production and transportation scheduling problem in a two-stage supply chain Moreover, several constraints are also considered, including time windows due dates, and suppliers and vehicles availability times. After presenting the mathematical model of the problem, a developed version of GA called Time Travel to History (TTH) algorithm, inspired from the idea of traveling through history, is proposed to solve the problem. In order to validate the performance of the proposed algorithm, the results of TTH algorithm are compared with two other genetic algorithms in the literature. The comparison results show the better performance of the proposed algorithm. Moreover, the results of implementing the sensitivity analysis to the main parameters of the algorithm show the behavior of the objective functions when the parameters are changed.
引用
收藏
页码:107 / 132
页数:26
相关论文
共 50 条
  • [41] A workload balancing genetic algorithm for the quay crane scheduling problem
    Chung, S. H.
    Chan, Felix T. S.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (16) : 4820 - 4834
  • [42] A genetic algorithm for a Bicriteria flexible job shop scheduling problem
    Vilcot, Geoffrey
    Billaut, Jean-Charles
    Esswein, Carl
    2006 INTERNATIONAL CONFERENCE ON SERVICE SYSTEMS AND SERVICE MANAGEMENT, VOLS 1 AND 2, PROCEEDINGS, 2006, : 1240 - 1244
  • [43] A genetic algorithm for solving the economic lot scheduling problem with reworks
    Chang, Yu-Jen
    Yao, Ming-Jong
    PROCEEDINGS OF THE EIGHTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2009, 8 : 294 - 306
  • [44] Solving an Industrial Shop Scheduling Problem Using Genetic Algorithm
    Moghadam, Ali Mokhtari
    Wong, Kuan Yew
    Piroozfard, Hamed
    Asl, Ali Derakhshan
    Hutajulu, Tiurmai Shanty
    MATERIALS, INDUSTRIAL, AND MANUFACTURING ENGINEERING RESEARCH ADVANCES 1.1, 2014, 845 : 564 - 568
  • [45] A Genetic Algorithm for the Parallel Machine Scheduling Problem with Consumable Resources
    Belkaid, Faycal
    Sari, Zaki
    Souier, Mehdi
    INTERNATIONAL JOURNAL OF APPLIED METAHEURISTIC COMPUTING, 2013, 4 (02) : 17 - 30
  • [46] Dynamic supply chain scheduling
    Ivanov, D.
    Sokolov, B.
    JOURNAL OF SCHEDULING, 2012, 15 (02) : 201 - 216
  • [47] Dynamic supply chain scheduling
    D. Ivanov
    B. Sokolov
    Journal of Scheduling, 2012, 15 : 201 - 216
  • [48] JOB SCHEDULING WITH THE HELP OF DOMINANCE PROPERTIES AND GENETIC ALGORITHM ON HYBRID FLOW SHOP PROBLEM
    Alcan, Pelin
    Basligil, Huseyin
    SIGMA JOURNAL OF ENGINEERING AND NATURAL SCIENCES-SIGMA MUHENDISLIK VE FEN BILIMLERI DERGISI, 2015, 6 (01): : 127 - 137
  • [49] A GENETIC ALGORITHM FOR SOLVING THE ECONOMIC LOT SCHEDULING PROBLEM WITH REWORKS
    Chang, Yu-Jen
    Yao, Ming-Jong
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2009, 26 (05) : 411 - 425
  • [50] A hybrid genetic algorithm for no-wait flowshop scheduling problem
    Tseng, Lin-Yu
    Lin, Ya-Tai
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2010, 128 (01) : 144 - 152