A Genetic Algorithm Developed for a Supply Chain Scheduling Problem

被引:7
作者
Taheri, Seyed Mohammad Reza [1 ]
Beheshtinia, Mohammad Ali [1 ]
机构
[1] Univ Semnan, Dept Ind Engn, Semnan, Iran
关键词
Genetic algorithm; Meta-heuristic; Supply chain; Scheduling; Logistic; OPTIMIZATION;
D O I
10.22059/IJMS.2019.254633.673069
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper concentrates on the minimization of total tardiness and earliness of orders in an integrated production and transportation scheduling problem in a two-stage supply chain Moreover, several constraints are also considered, including time windows due dates, and suppliers and vehicles availability times. After presenting the mathematical model of the problem, a developed version of GA called Time Travel to History (TTH) algorithm, inspired from the idea of traveling through history, is proposed to solve the problem. In order to validate the performance of the proposed algorithm, the results of TTH algorithm are compared with two other genetic algorithms in the literature. The comparison results show the better performance of the proposed algorithm. Moreover, the results of implementing the sensitivity analysis to the main parameters of the algorithm show the behavior of the objective functions when the parameters are changed.
引用
收藏
页码:107 / 132
页数:26
相关论文
共 19 条
[1]  
Beheshtinia M. A., 2017, J MODELLING MANAGEME, V13, P27
[2]   A multi-objective and integrated model for supply chain scheduling optimization in a multi-site manufacturing system [J].
Beheshtinia, Mohammad Ali ;
Ghasemi, Amir .
ENGINEERING OPTIMIZATION, 2018, 50 (09) :1415-1433
[3]   A developed genetic algorithm for solving the multi-objective supply chain scheduling problem [J].
Borumand, Ali ;
Beheshtinia, Mohammad Ali .
KYBERNETES, 2018, 47 (07) :1401-1419
[4]  
Chang Y. C., 2015, J TEST EVAL, V44, P1337
[5]   Machine scheduling with job delivery coordination [J].
Chang, YC ;
Lee, CY .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 158 (02) :470-487
[6]   Genetic algorithm optimisation of an integrated aggregate production-distribution plan in supply chains [J].
Fahimnia, Behnam ;
Luong, Lee ;
Marian, Romeo .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (01) :81-96
[7]   On-line Supply Chain Scheduling Problem with Capacity Limited Vehicles [J].
Han, B. ;
Zhang, W. J. .
IFAC PAPERSONLINE, 2015, 48 (03) :1539-1544
[8]  
Holland John H, 1992, Adaptation in natural and artificial systems: an introductory analysis with applications to biology, control, and artificial intelligence
[9]   The coordinated production and transportation scheduling problem with a time-sensitive product: a branch-and-cut algorithm [J].
Karaoglan, Ismail ;
Kesen, Saadettin Erhan .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (02) :536-557
[10]   A fuzzy goal programming approach for vendor selection problem in a supply chain [J].
Kumar, M ;
Vrat, P ;
Shankar, R .
COMPUTERS & INDUSTRIAL ENGINEERING, 2004, 46 (01) :69-85