Optimal planning and scheduling for repetitive construction projects

被引:122
|
作者
Hyari, K [1 ]
El-Rayes, K
机构
[1] Univ Illinois, Dept Civil & Environm Engn, Urbana, IL 61801 USA
[2] Hashemite Univ, Dept Civil Engn, Zarqa 13115, Jordan
关键词
road construction; highway construction; scheduling; resource management; optimization; evolutionary computation; computer models; construction management;
D O I
10.1061/(ASCE)0742-597X(2006)22:1(11)
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper presents a multiobjective optimization model for the planning and scheduling of repetitive construction projects. The model enables construction planners to generate and evaluate optimal construction plans that minimize project duration and maximize crew work continuity, simultaneously. The computations in the present model are organized in three major modules: scheduling, optimization, and ranking modules. First, the scheduling module uses a resource-driven scheduling algorithm to develop practical schedules for repetitive construction projects. Second, the optimization module utilizes multiobjective genetic algorithms to search for and identify feasible construction plans that establish optimal tradeoffs between project duration and crew work continuity. Third, the ranking module uses multiattribute utility theory to rank the generated plans in order to facilitate the selection and execution of the best overall plan for the project being considered. An application example is analyzed to illustrate the use of the model demonstrate its new capabilities in optimizing the planning and scheduling of repetitive construction projects.
引用
收藏
页码:11 / 19
页数:9
相关论文
共 50 条
  • [41] Geographic information system-based visualization system for planning and monitoring of repetitive construction projects
    Sonmez, Rifat
    Uysal, Furkan
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2008, 35 (11) : 1342 - 1346
  • [42] DEVELOPING A MATHEMATICAL MODEL FOR PLANNING REPETITIVE CONSTRUCTION PROJECTS BY USING SUPPORT VECTOR MACHINE TECHNIQUE
    Burhan, Abbas M.
    Erzaij, Kadhim Raheim
    Hatem, Wadhah Amer
    CIVIL AND ENVIRONMENTAL ENGINEERING, 2021, 17 (02) : 371 - 379
  • [43] Optimizing resource utilization for repetitive construction projects
    El-Rayes, K
    Moselhi, O
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2001, 127 (01): : 18 - 27
  • [44] CONSTRUCTION PLANNING FOR LINEAR PROJECTS
    SELINGER, S
    JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1980, 106 (02): : 195 - 205
  • [45] Harmonizing construction processes in repetitive construction projects with multiple buildings
    Tomczak, Michas
    Jaskowski, Piotr
    AUTOMATION IN CONSTRUCTION, 2022, 139
  • [46] CONSTRUCTION PLANNING FOR LINEAR PROJECTS
    Selinger, Shlomo
    American Society of Civil Engineers, Journal of the Construction Division, 1980, 106 (02): : 195 - 205
  • [47] Acceleration of repetitive units in construction projects using line-of-balance and linear scheduling with singularity function
    Ali, I. Shabeer
    Rakesh, P.
    Anand, K. B.
    INTERNATIONAL CONFERENCE ON ADVANCES IN MATERIALS AND MANUFACTURING APPLICATIONS (ICONAMMA-2018), 2019, 577
  • [48] Fuzzy Repetitive Scheduling Method for Projects with Repeating Activities
    Maravas, Alexander
    Pantouvakis, John-Paris
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2011, 137 (07): : 561 - 564
  • [49] LOB and CPM Integrated Method for Scheduling Repetitive Projects
    Ammar, Mohammad A.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2013, 139 (01) : 44 - 50
  • [50] Scheduling programs with repetitive projects: An efficient approximation procedure
    Amor, JP
    DECISION SCIENCES INSTITUTE 1998 PROCEEDINGS, VOLS 1-3, 1998, : 1556 - 1556