Three-dimensional structural analyses of the shield-driven "Green Heart" Tunnel of the High-Speed Line South

被引:155
作者
Blom, CBM
van der Horst, EJ
Jovanovic, PS
机构
[1] Project Org. High-Speed Line South, Bore Tunnel Groene Hart Proj. Office, Postbus 20000, 3502 LA, Utrecht
关键词
D O I
10.1016/S0886-7798(99)00035-8
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The tunnel lining generates a significant part of the bore tunnel project costs. This tunnel structure is one of the most important components of the whole tunneling process. The tunnel structure has to fulfill all necessary functional requirements during its lifetime. Because of this it is essential for engineers first to understand the realistic tunnel-lining behaviour and then to design a tunnel structure in a proper way. The design of the lining structure is actually quite simple because of the wide range easy-to-use models now available. In contrast, predicting realistic tunnel-lining behavior is very difficult. The available numerical models for a segmented concrete lining cannot predict realistic structure behavior at all stages of excavation and during the tunnel lifetime. Conventional models ignore the influences of assembling processes, imperfections of segments, type of joints and variation in stress distributions in the concrete sections. This paper deals with three-dimensional finite element analyses of the tunnel structure, observations during the construction phase and in-situ measurements on, the Second Heinenoord Tunnel (Bakker 1999) applied on the structural design of the shield-driven "Green Heart" Tunnel of the High Speed Line-South in the Netherlands. (C) 1999 Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:217 / 224
页数:8
相关论文
共 9 条
[1]   Monitoring pilot projects using bored tunnelling: the Second Heinenoord Tunnel and the Botlek Rail Tunnel [J].
Bakker, KJ ;
de Boer, F ;
Admiraal, JBM ;
van Jaarsveld, EP .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 1999, 14 (02) :121-129
[2]  
BAKKER KJ, 1996, P TC28 S CIT U LOND
[3]  
BLOM CBM, 1998, P C NUM METH GEOT EN
[4]  
BLOM CBM, 1997, TWEEDE ORDE EVALUATI
[5]  
Duddeck H., 1980, BAUTECHNIK, V10, P349
[6]  
LEENDERTSE WL, 1997, TUNNELS PEOPLE, V2, P593
[7]  
OOSTERHOUT GPC, 1999, 2 HEIN TUNN C P 1999
[8]  
VANDEHORST EJ, 1999, CHALLENGES 21 CENTUR, V1, P363
[9]  
VANDERHORST EJ, 1998, INVLOED VOEGMATERIAL