Petri net-based scheduling strategy and energy modeling for the cylinder block remanufacturing under uncertainty

被引:38
作者
Peng, Shitong [1 ,4 ]
Li, Tao [1 ]
Zhao, Jiali [2 ]
Guo, Yanchun [1 ]
Lv, Shengping [3 ]
Tan, George Z. [4 ]
Zhang, Hongchao [1 ,4 ]
机构
[1] Dalian Univ Technol, Inst Sustainable Design & Mfg, Dalian, Peoples R China
[2] Lanzhou Univ Technol, Sch Mech & Elect Engn, Lanzhou, Gansu, Peoples R China
[3] South China Agr Univ, Coll Engn, Guangzhou, Guangdong, Peoples R China
[4] Texas Tech Univ, Dept Ind Mfg & Syst Engn, Lubbock, TX 79409 USA
关键词
Remanufacturing scheduling; Petri net; A(star) algorithm; Engine remanufacturing; Remanufacturing uncertainty; CONSUMPTION; ALGORITHM; OPERATIONS; SYSTEM;
D O I
10.1016/j.rcim.2019.03.004
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Scheduling has been extensively applied to remanufacturing for the organization of production activities, and it would directly influence the overall performance of the remanufacturing system. Since the conjunction of Petri net (PN) and artificial intelligence (AI) searching technique was demonstrated to be a promising approach to solve the scheduling problems in manufacturing systems, this study built a transition timed PN combined with heuristic A(star) algorithm to deal with the scheduling in remanufacturing. The PN was applied to the formulation of remanufacturing process, while the A(star) algorithm generated and searched for an optimal or near optimal feasible schedule through the reachability graph (RG). We took the high value-added cylinder block of engine as a research object to minimize the makespan of reprocessing a batch used components. This scheduling problem involved in batch and parallel processing machines, and the uncertain processing time and routes will complicate the scheduling problem. Three heuristics were designed to guide the search process through the RG in PN. To avoid state space explosion and select promising nodes, a new rule-based dynamic window was developed to improve the efficiency of the algorithm, and this rule was examined to outperform the conventional one. Under the determined scheduling strategy, the dynamic behavior of energy consumption rate during the processing time was simulated using PN tool, which would assist remanufacturers to develop potential strategies for energy efficiency improvement. Considering the uncertainty of processing time, the Monte Carlo simulation method was adopted to statistically analyze the distributions of makespan and total energy consumption, which would contribute to the comprehensive production scheduling and energy profile assessment for sustainable re manufacturing.
引用
收藏
页码:208 / 219
页数:12
相关论文
共 45 条
  • [1] Trade-off analysis between machining time and energy consumption in impeller NC machining
    Arriaza, Oscar Velasquez
    Kim, Dong-Won
    Lee, Dong Yoon
    Suhaimi, Mohd. Azlan
    [J]. ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2017, 43 : 164 - 170
  • [2] Deadlock-Free Scheduling Method for Flexible Manufacturing Systems Based on Timed Colored Petri Nets and Anytime Heuristic Search
    Baruwa, Olatunde T.
    Piera, Miquel Angel
    Guasch, Antoni
    [J]. IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2015, 45 (05): : 831 - 846
  • [3] Petri net based decision system modeling in real-time scheduling and control of flexible automotive manufacturing systems
    Basak, Ozkan
    Albayrak, Y. Esra
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2015, 86 : 116 - 126
  • [4] Simulation-based approach to modeling the carbon emissions dynamic characteristics of manufacturing system considering disturbances
    Cao, Huajun
    Li, Hongcheng
    [J]. JOURNAL OF CLEANER PRODUCTION, 2014, 64 : 572 - 580
  • [5] Energy-aware integrated process planning and scheduling for job shops
    Dai, Min
    Tang, Dunbing
    Xu, Yuchun
    Li, Weidong
    [J]. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2015, 229 : 13 - 26
  • [6] Energy-efficient scheduling for a flexible flow shop using an improved genetic-simulated annealing algorithm
    Dai, Min
    Tang, Dunbing
    Giret, Adriana
    Salido, Miguel A.
    Li, W. D.
    [J]. ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2013, 29 (05) : 418 - 429
  • [7] An improved artificial bee colony algorithm for flexible job-shop scheduling problem with fuzzy processing time
    Gao, Kai Zhou
    Suganthan, Ponnuthurai Nagaratnam
    Pan, Quan Ke
    Chua, Tay Jin
    Chong, Chin Soon
    Cai, Tian Xiang
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2016, 65 : 52 - 67
  • [8] Product structure complexity and scheduling of operations in recoverable manufacturing
    Guide, VDR
    Srivastava, R
    Kraus, ME
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (11) : 3179 - 3199
  • [9] A Petri net-based particle swarm optimization approach for scheduling deadlock-prone flexible manufacturing systems
    Han, Libin
    Xing, Keyi
    Chen, Xiao
    Xiong, Fuli
    [J]. JOURNAL OF INTELLIGENT MANUFACTURING, 2018, 29 (05) : 1083 - 1096
  • [10] MODELING AND ONLINE SCHEDULING OF FLEXIBLE MANUFACTURING SYSTEMS USING STOCHASTIC PETRI NETS
    HATONO, I
    YAMAGATA, K
    [J]. IEEE TRANSACTIONS ON SOFTWARE ENGINEERING, 1991, 17 (02) : 126 - 132